(325,829 gallons/43,560 square feet)/12 inches = (0.62)
|
325,829 gallons = one acre foot
|
43,560 square feet = one acre
|
12 inches = one foot
|
To convert gallons per year to 100-cubic-feet per year, another
common billing unit for water, divide gallons per year by 748. (748
gallons = 100 cubic feet.)
|
A combined plant mix with a site-wide average of 0.5 is the
basis of the plant factor portion of this calculation. The irrigation
efficiency for purposes of the ET adjustment factor is 0.625, therefore,
the ET adjustment factor (0.8) = (0.5/0.625).
|
MAWA = (ETo) (o.8) (LA) (o.62) where:
| ||
MAWA
|
=
|
Max. applied water allowance (gallons per year)
|
ETo
|
=
|
Reference evapotranspiration (inches per year)
|
0.8
|
=
|
ET adjustment factor
|
LA
|
=
|
Landscaped area (square feet)
|
0.62
|
=
|
Conversion factor (to gallons per square foot)
|
MAWA
|
=
|
(ETo) (.8) (LA) (.62)
|
|
=
|
(51 inches) (.8) (50,000 square feet) (.62)
|
|
Maximum applied water allowance = 1,264,800 gallons per year
(or 1,691 hundred-cubic-feet per year: 1,264,800/748 = 1,691)
|
MAWA
|
=
|
(ETo) (.8) (LA) (.62)
|
|
=
|
(35 inches) (.8) (50,000 square feet) (.62)
|
|
Maximum Applied Water Allowance = 868,000 gallons per year (or
1,160 hundred-cubic-feet per year)
|
EWU (hydrozone)
|
=
|
(ETo) (PF) (HA) (.62)
(IE)
|
EWU (hydrozone)
|
=
|
Estimated water use (gallons per year)
|
ETo
|
=
|
Reference evapotranspiration (inches per year)
|
PF
|
=
|
Plant factor
|
HA
|
=
|
Hydrozone area (square feet)
|
(.62)
|
=
|
Conversion factor
|
IE
|
=
|
Irrigation efficiency
|
EXHIBIT "A"
| |||
---|---|---|---|
SAMPLE WATER CONSERVATION CONCEPT STATEMENT
| |||
Project Site:
|
Project Number:
| ||
Project Location:
|
| ||
Landscape Architect/Irrigation Designer/Contractor:
|
| ||
Included in this project submittal package are:
|
| ||
(Check to indicate completion)
|
| ||
_____
|
1.
|
Maximum Applied Water Allowance:
|
|
_____
|
_____ gallons or cubic feet/year
|
| |
_____
|
2.
|
Estimated Applied Water Use:
|
|
_____
|
_____ gallons or cubic feet/year
|
| |
_____
|
*2.(a)
|
Estimated Amount of Water Expected from Effective Precipitation:
|
|
_____
|
_____ gallons or cubic feet/year
|
| |
_____
|
3.
|
Estimated Total Water Use:
|
|
_____
|
_____ gallons or cubic feet/year
|
| |
Note: * If the design assumes that a part of the Estimated Total
Water Use will be provided by precipitation, the Effective Precipitation
Disclosure Statement in Section 704 shall be completed and submitted.
The Estimated Amount of Water Expected from Effective Precipitation
shall not exceed 25 percent of the local annual mean precipitation
(average rainfall).
| |||
_____
|
4.
|
Landscape Design Plan
|
|
_____
|
5.
|
Irrigation Design Plan
|
|
_____
|
6.
|
Irrigation Schedule
|
|
_____
|
7.
|
Maintenance Schedule
|
|
_____
|
8.
|
Landscape Irrigation Audit Schedule
|
|
_____
|
9.
|
Grading Design Plan
|
|
_____
|
10.
|
Soil Analysis
|
|
Description of Project
| |
---|---|
(Briefly describe the planning and design actions that are intended
to achieve conservation and efficiency in water use.)
| |
Date: _______________
|
Prepared By: _______________
|
EXHIBIT "B"
| ||
---|---|---|
SAMPLE CERTIFICATE OF SUBSTANTIAL COMPLETION
| ||
Project Site/Number:______________________________
| ||
Project Location:_________________________________
| ||
Preliminary Project Documentation Submitted (Check indicating
submittal)
| ||
_____
|
1.
|
Maximum Applied Water Allowance:
|
_____
|
_____ (gallons or cubic feet per year)
| |
_____
|
2.
|
Estimated Applied Water Use:
|
_____
|
_____ (gallons or cubic feet/year)
| |
_____
|
*2a.
|
Estimated Amount of Water Expected from Effective Precipitation:
|
_____
|
_____ (gallons of cubic feet/year)
| |
_____
|
3.
|
Estimated Total Water Use:
|
_____
|
_____ (gallons of cubic feet/year)
| |
NOTE: *If the design assumes that a part of the Estimated Total
Water Use will be provided by precipitation, the Effective Precipitation
Disclosure Statement shall be completed and submitted. The estimated
Amount of Water Expected from Effective Precipitation shall not exceed
25 percent of the local annual mean precipitation (average rainfall).
| ||
_____
|
4.
|
Landscape Design Plan
|
_____
|
5.
|
Irrigation Design Plan
|
_____
|
6.
|
Irrigation Schedules
|
_____
|
7.
|
Maintenance Schedule
|
_____
|
8.
|
Landscape Irrigation Audit Schedule
|
_____
|
9.
|
Grading Design Plan
|
_____
|
10.
|
Soil Analysis
|
Post-Installation Inspection: (Check indicating substantial
completion)
| ||
_____
|
A.
|
Plants installed as specified
|
_____
|
B.
|
Irrigation system installed as designed
|
_____ dual distribution system for recycled water
| ||
_____ minimal run off or overspray
| ||
_____
|
C.
|
Landscape irrigation Audit performed
|
_____ Project submittal package and a copy of this certification
has been provided to owner/manager and local water agency.
|
Comments:
| |
I/we certify that work has been installed in accordance with
the contract documents.
| |
Contractor
|
Signature
|
Date
|
License Number
|
I/we certify that based upon periodic site observations, the
work has been substantially completed in accordance with the Water
Efficient Landscape Ordinance and that the landscape planting and
irrigation installation conform with the approved plans and specifications.
| |
Landscape Architect
or Irrigation Designer/Consultant
or Licensed or Certified Professional in a Related Field
|
Signature
|
Date
|
State License Number
|
I/we certify that I/we have received all of the contract documents
and that it is our responsibility to see that the project is maintained
in accordance with the contract documents.
| |
Owner
|
Signature
|
Date
|
|
EXHIBIT "C"
|
---|
SAMPLE EFFECTIVE PRECIPITATION DISCLOSURE STATEMENT
|
I certify that I have informed the project owner and developer
that this project depends on _____ (gallons or cubic feet) of effective
precipitation per year. This represents _____ percent of the local
mean precipitation of _____ inches per year.
|
I have based my assumptions about the amount of precipitation
that is effective upon:
|
|
I certify that I have informed the project owner and developer
that in times of drought, there may not be enough water available
to keep the entire landscape alive.
|
_______________________________________________
Licensed or Certified Landscape Professional
|
I certify that I have been informed by the licensed or certified
landscape professional that this project depends upon _____ (gallons
or cubic feet) of effective precipitation per year. This represents
_____ percent of the local mean precipitation of _____ inches per
year.
|
I certify that I have been informed that in times of drought,
there may not be enough water available to keep the entire landscape
alive.
|
_________________________
Owner
|
_________________________
Developer
|
EXHIBIT "D"
| |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
REFERENCE EVAPOTRANSPIRATION
| |||||||||||||
(In inches—Historical Data, extrapolated from 12-month
Normal Year ETo Maps and U.C. publication 21426)
| |||||||||||||
SAN BERNARDINO COUNTY
| |||||||||||||
City
|
Jan
|
Feb
|
Mar
|
Apr
|
May
|
Jun
|
Jul
|
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
Ann
ETo.
|
Baker
|
2.7
|
3.9
|
6.1
|
8.3
|
10.4
|
11.8
|
12.2
|
11.0
|
8.9
|
6.1
|
3.3
|
2.1
|
86.6
|
Barstow
|
2.6
|
3.6
|
5.7
|
7.9
|
10.1
|
11.6
|
12.0
|
10.4
|
8.6
|
5.7
|
3.3
|
2.1
|
83.6
|
Chino
|
2.1
|
2.9
|
3.9
|
4.5
|
5.7
|
6.5
|
7.3
|
7.1
|
5.9
|
4.2
|
2.6
|
2.0
|
54.6
|
Crestline
|
1.5
|
1.9
|
3.3
|
4.4
|
5.5
|
6.6
|
7.8
|
7.1
|
5.4
|
3.5
|
2.2
|
1.6
|
50.8
|
Needles
|
3.2
|
4.2
|
6.6
|
8.9
|
11.0
|
12.4
|
12.8
|
11.0
|
8.9
|
6.6
|
4.0
|
2.7
|
92.1
|
Lucerne Valley
|
2.2
|
2.9
|
5.1
|
6.5
|
9.2
|
11.0
|
11.4
|
9.9
|
7.4
|
5.0
|
3.0
|
1.8
|
75.3
|
San Bernardino
|
2.0
|
2.7
|
3.8
|
4.6
|
5.7
|
6.9
|
7.9
|
7.4
|
5.9
|
4.2
|
2.6
|
2.0
|
55.6
|
29 Palms
|
2.6
|
3.6
|
5.9
|
7.9
|
10.1
|
11.2
|
11.2
|
10.3
|
8.6
|
5.9
|
3.4
|
2.2
|
82.9
|
Victorville
|
2.3
|
3.1
|
4.9
|
6.7
|
9.3
|
10.0
|
11.2
|
9.8
|
7.4
|
5.1
|
2.8
|
1.8
|
74.6
|