Banner signs shall be erected as outlined below. Such signs shall be constructed of cloth, canvas, or similar material and must be anchored in such a way that would prevent the sign from moving freely in the wind. Businesses that erect signs under the provisions of this section shall not display a sign that states “Going Out of Business” or similar message more than one time.
(1) During the initial year of operation, a business shall be permitted to erect one (1) temporary banner sign, a maximum of one (1) time. Such signs shall be erected a maximum of forty-five (45) days. The permit application for the sign must include the date the sign will be erected, the date the sign will be removed and a drawing showing the location of the sign. The permit fee for a temporary banner sign is as listed in the fee schedule in appendix
A of this code. The effective area for such signs shall not exceed forty (40) square feet.
(2) A business that has been in operation for a period of one (1) year or more shall be permitted to erect one (1) temporary banner sign at the occupancy two (2) times per calendar year. Such signs shall be erected a maximum of fourteen (14) days for each permit. A new permit for such a sign shall not be issued within thirty (30) days of the date that any temporary banner sign was erected at the occupancy. The permit fee for a temporary banner sign is as listed in the fee schedule in appendix
A of this code. The effective area for such signs shall not exceed forty (40) square feet
(A) Nonprofit organizations shall be permitted to display temporary banner signs as outlined above. A sign permit is required; however, no permit fee will be assessed.
(3) New multi-family developments shall be allowed to display one (1) banner sign as provided in this subsection. Signs shall refer to leasing information only and shall be removed within six (6) months of the date the permit was issued. Signs shall not exceed one hundred fifty (150) square feet in effective area. The permit fee for a temporary banner sign is as listed in the fee schedule in appendix
A of this code.
(Ordinance 1002, sec. 14-5-4, adopted 3/15/11; Ordinance adopting 2023 Code)