It is anticipated that these areas will not be sewered but will provide for residential development in a low-density, self-sustaining, rural environment, with site plan review providing careful controls to ensure the compatibility of future development.
A.
Written approval. Land uses in this district shall require written approval from the authority as indicated (e.g., special exception approval by the Board of Appeals, site plan approval after site plan review by the Planning Board), prior to issuance of a permit by the Code Enforcement Officer.
B.
Permitted uses not requiring CEO approval. Permitted uses listed below do not require approval by the Code Enforcement Officer. (Uses located within the Shoreland Zone, as shown on the Official Shoreland Zoning Map, are subject to the regulations of Part 3, Shoreland Zoning, especially Table 3.14-1, Land Uses in the Shoreland Zone, and § 10-3.20, Prohibited uses. Construction or other development within the special flood hazard Zone A1, as shown on the Frye Island Portion of the FEMA Flood Insurance Map, requires a flood hazard development permit from the Code Enforcement Officer as specified in Part 4, Floodplain Management.)
C.
Permitted uses requiring CEO approval only. Permitted uses listed below require approval from the Code Enforcement Officer only, and do not require site plan review. (Uses located within the Shoreland Zone, as shown on the Official Shoreland Zoning Map, are subject to the regulations of Part 3, Shoreland Zoning, especially Table 3.14-1, Land Uses in the Shoreland Zone, and § 10-3.20, Prohibited uses. Construction or other development within the special flood hazard Zone A1, as shown on the Frye Island Portion of the FEMA Flood Insurance Map, requires a flood hazard development permit from the Code Enforcement Officer as specified in Part 4, Floodplain Management.)
D.
Permitted uses requiring site plan review. Permitted uses listed below require site plan review and approval by the Planning Board, in accordance with Article XII, prior to the issuance of a permit by the Code Enforcement Officer. (Uses located within the Shoreland Zone, as shown on the Official Shoreland Zoning Map, are subject to the regulations of Part 3, Shoreland Zoning, especially Table 3.14-1, Land Uses in the Shoreland Zone, and § 10-3.20, Prohibited uses. Construction or other development within the special flood hazard Zone A1, as shown on the Frye Island Portion of the FEMA Flood Insurance Map, requires a flood hazard development permit from the Code Enforcement Officer as specified in Part 4, Floodplain Management.)
(1)
Adult day care (on a conforming lot only; not permitted in a cluster subdivision).
(2)
Church.
(3)
Day-care home (on a conforming lot only; not permitted in a cluster subdivision).
(4)
Home occupation Level 1.
(5)
Home retail sales (on a conforming lot only; not permitted in a cluster subdivision).
(6)
Municipal use.
E.
Uses requiring special exception. Uses listed below shall first require approval from the Board of Appeals as a special exception, in accordance with standards set forth in § 10-1.58A(2). Such uses shall also require site plan review and approval from the Planning Board prior to the issuance of a permit by the Code Enforcement Officer. (Uses located within the Shoreland Zone, as shown on the Official Shoreland Zoning Map, are subject to the regulations of Part 3, Shoreland Zoning, especially Table 3.14-1, Land Uses in the Shoreland Zone, and § 10-3.20, Prohibited uses. Construction or other development within the special flood hazard Zone A1, as shown on the Frye Island Portion of the FEMA Flood Insurance Map, requires a flood hazard development permit from the Code Enforcement Officer as specified in Part 4, Floodplain Management.)
(1)
Home occupation Level 2 (on a conforming lot only; not permitted in a cluster subdivision).
H.
J.
Lots in a cluster subdivision. Lots in a cluster subdivision must maintain the setbacks approved with the subdivision unless a variance is obtained.
K.
Exception to minimum setbacks. Given the nature and dimensions of many of the lots on Frye Island, and as a result of a 2014 decision by the Maine Superior Court, the minimum setback requirements in Subsections G and H may be reduced only as follows:
[Added 10-8-2016 TM]
(1)
At most, one of the setback requirements (front, side or rear) may be reduced by maximum of five feet.
(2)
The side setback may be reduced only on one side of the structure.
(3)
Setback reductions shall not be used, and are not available, to reduce required minimum setbacks of structures from bodies of water as provided in the Shoreland Zoning requirements in Part 3.
(4)
All such exceptions must be based on a professional boundary survey of the property in question.