[Ord. No. 2022-09-03, 9/26/2022]
1. The municipality shall inspect all phases of the installation of
the best management practices (BMPs) and/or stormwater management
(SWM) facilities as deemed appropriate by the municipality.
2. During any stage of the work, if the municipality determines that
the BMPs and/or stormwater management facilities are not being installed
in accordance with the approved SWM site plan, the municipality shall
revoke any existing permits or other approvals and issue a cease and
desist order until a revised SWM site plan is submitted and approved,
as specified in this Part and until the deficiencies are corrected.
3. A final inspection of all BMPs and/or stormwater management facilities
may be conducted by the municipality to confirm compliance with the
approved SWM site plan prior to the issuance of any occupancy permit.
4. The applicant and/or developer shall be responsible for providing
as-built plans of all SWM BMPs included in the approved SWM site plan.
The as-built plans and an explanation of any discrepancies, which
were reviewed and received approval by the municipality, shall be
submitted to the municipality.
5. The as-built submission shall include a certification of completion
signed by a qualified professional verifying that all SWM BMPs have
been constructed according to the approved plans and specifications.
If any qualified professionals contributed to the construction plans,
they must sign and seal the completion certificate. The latitude and
longitude coordinates for all permanent SWM BMPs must also be submitted,
at the central location of the BMPs. The Township Engineer shall conduct
a final inspection once notified the project is completed and prior
to the Township closing out the project or starting the maintenance
period.