(a)
It shall be unlawful for any person to construct, structurally alter, or remodel any building within the city limits without obtaining a permit therefor from the city, except for where the total costs of such construction or alteration do not exceed one thousand dollars ($1,000.00). Application for such building permit shall be made upon a form furnished by the city and upon presentation of plans and specifications in detail of the proposed improvements. The charge for building permits shall be $0.15 per square foot of building with a minimum charge of $40.00 per permit. Building permits are good for six months.
(b)
No building shall be moved from one location to another within the city, nor shall a building be moved into the city from outside the city unless and until a permit has been obtained therefor, and all setbacks have been inspected before the building is put in. This includes all storage buildings, secondary buildings, and carports.
(c)
Carports: Carports shall not be located in the front yard. They must meet all setback requirements as a secondary building unless attached to the side or rear of the house. Side or rear yard placement may only be 14' or the height of the eves of the house whichever is less. Attachment must be at the eves of the roof or each post of the carport physically attached to the house on the side.
(d)
Roofing Permits:
(1)
Roofing contractors will have a permit fee of $40.00 and an additional charge of $3.50/square for every roofing permit obtained. This will allow the contractor to use the landfill, or not. There will be no charging of permit fees.
(2)
Roofing contractors will have thirty (30) days from the time the permit is obtained to complete the work. This eliminates the city holding the permit for several months. After 30 days, another permit will have to be obtained.
(3)
Examples of projects that would need a permit include, but are not limited to:
(A)
Any new home construction/additions;
(B)
Garage/siding;
(C)
Demolition of a structure;
(D)
Storage buildings;
(E)
Mobile/manufactured/modular home;
(F)
Interior remodel/bath/kitchen/flooring;
(G)
Fences;
(H)
Plumbing/electrical/sprinkler systems;
(I)
Any structure placed on your property including cement work.
(1993 Code of Ordinances, Chapter 4, Article 1, Sec. 4-1; Ordinance 596 adopted 10/30/2018; Ordinance 606.5 adopted 6/23/2020)