The Public Works Director or his or her designee shall be given a written notice a minimum of 10 days prior to any street improvements that are to be performed that will cause the relocation of existing water mains, fittings, meters, or other water equipment. Any changes that are required or any damages that may occur to such mains, fittings, meters, or other water equipment without fault or negligence of the City, shall be chargeable to the person or agency requiring said work to be done.
(Prior code § 7350; 2811 § 1, 2012)