Sections 17.22.200 through 17.22.206 shall be known as "PDO-9" (Temecula Hospital Planned Overlay District).
(Ord. 06-01 § 3; Ord. 08-01 § 4)
The Temecula Hospital planned development overlay district is intended to provide for design flexibility with regards to the building height of hospital projects. Other aspects of this PDO will be consistent with the land use designations that are described in the land use element of the Temecula general plan.
(Ord. 06-01 § 3; Ord. 08-01 § 4)
Except as modified by the provisions of Section 17.22.206, the following rules and regulations shall apply to all planning applications in this area:
A. 
The development standards in the development code that would apply to any development in a professional office zoning district that are in effect at the time an application is deemed complete;
B. 
The citywide design guidelines that are in effect at the time an application is deemed complete;
C. 
The approval requirements contained in the development code that are in effect at the time the application is deemed complete;
D. 
Any other relevant rule, regulation or standard that is in effect at the time the application is deemed complete.
(Ord. 06-01 § 3; Ord. 08-01 § 4)
The development standards set forth in Chapter 17.08 of this title apply to this PDO with the exception of the following modification to allowable building heights. The maximum allowable building heights, as defined in Chapter 17.34 of this title for hospital buildings in the Temecula Hospital PDO district shall be limited as follows: No more than thirty percent of the total roof area of the hospital building may exceed the seventy-five-foot building height limit. The maximum building height for those portions of the hospital building within the thirty percent area may not exceed one hundred fifteen feet. For the purposes of this PDO, roof area is defined as that portion of the roof above occupied conditioned spaces bound by the inside face of the parapet wall that defines the roof area.
(Ord. 06-01 § 3; Ord. 08-01 § 4)