No person shall conduct any hauling of soil materials on public rights-of-way from or to the site of a grading operation, without first having obtained a haul route permit, if required, as specified in and subject to the requirements of the Engineering and Construction Manual.
Because this permit may be triggered by various factors (location, quantity of soil, truck trips, traffic, etc.), the city will determine if a haul route permit is required on a case-by-case basis prior to allowing any hauling operation to commence.
(Ord. 13-01 § 4)