(a)
It is unlawful for any person to construct, commence to construct or maintain or use within the city any derrick or other structure, equipment or machinery proposed or intended to be used or used for or in connection with the drilling for or production of oil, gas and other hydrocarbon substances without first obtaining a written permit therefor, to be issued by the chief building official in accordance with the terms of this title.
(b)
Such permit shall be required to drill, own, operate or maintain an oil well.
(c)
No additional permit shall be required for well servicing, redrilling or use for injection purposes of any well or well hole previously drilled with approval of the fire department.
(Prior code § 19-2; Ord. 71-O-123 §§ 2 (part) and 4, 1971)