Commercial
| |
Commercial application fee
|
$100.00
|
Commercial Plan Review
| |
New construction — up to $100,000.00 in value
|
$50.00
|
New construction — $100,001.00—$500,000.00 in value
|
$350.00 for first $100,000.00 and then $2.00 for each additional
$1,000.00
|
New construction — $500,000.00—$1,000,000 in value
|
$1,050.00 for first $500,000 and then $1.50 for each additional
$1,000.00
|
New construction — $1,000,000.00 and up in value
|
$2,000.00 for first $1,000,000.00 and then $1.00 for each additional
$1,000.00
|
Commercial finish out/remodel (existing and shell buildings)
|
$300.00
|
Commercial Permits New Construction and Inspection
| |
Up to 5,000 sq. ft. (add separate mechanical, electrical, and
plumbing permits)
|
$350.00 + $0.10 per sq. ft.
|
Up to 5,001 sq. ft. (add separate mechanical, electrical, and
plumbing permits)
|
$500.00 + $0.10 per sq. ft.
|
Trade Permit
| |
Electrical Permit
|
$100.00 + $0.10 per sq. ft.
|
Mechanical Permit
|
$100.00 + $0.10 per sq. ft.
|
Plumbing Permit
|
$100.00 + $0.10 per sq. ft.
|
Commercial Remodels/Renovations/Additions/Alterations/Finish
Outs/Repairs to Existing Buildings
| |
1 to 500 sq. ft.
|
$200.00
|
501 to 2,500 sq. ft.
|
$400.00
|
2,501 to 5,000 sq. ft.
|
$650.00
|
Over 5,001 sq. ft.
|
$450.00 + $0.10 per sq. ft.
|
Trade Permit (Commercial Remodels/Renovations/Additions/Alterations/Finish
Outs/Repairs to Existing Buildings
| |
Electrical Permit
|
$100.00 + $0.10 per sq. ft.
|
Mechanical Permit
|
$100.00 + $0.10 per sq. ft.
|
Plumbing Permit
|
$100.00 + $0.10 per sq. ft.
|
Commercial Reinspection Fees
| |
1st reinspection
|
$65.00
|
2nd reinspection
|
$130.00
|
3rd reinspection
|
$190.00
|
Certificate of Occupancy
| |
Certificate of occupancy (commercial - change of occupancy type)
|
$100.00
|
Temporary certificate of occupancy
|
$100.00
|
Certificate of occupancy (vacant for over 6 months)
|
$100.00
|
Residential
| |
Application fee
|
$100.00
|
Residential Plan Review
| |
Residential up to 5,000 sq. ft.
|
$100.00
|
Residential over 5,001 sq. ft.
|
$150.00 + $0.10 per sq. ft.
|
New Residential Construction Permit
| |
1- and 2-family dwelling up to 5,000 sq. ft. (includes all permits)
(duplexes are permitted as 2 residents)
|
$1,250.00
|
1- and 2-family dwelling over 5,001 sq. ft. (includes all permits)
(Duplexes are permitted as 2 residents)
|
$1,250.00 + $0.10 per sq. ft.
|
Residential Remodel Permit
| |
Remodel, repair, alteration, addition
|
$50.00 + $50.00 per trades (MEP) *$200.00
|
Residential Reinspection Fees
| |
1st reinspection
|
$65.00
|
2nd reinspection
|
$130.00
|
3rd reinspection
|
$190.00
|
Sign Permits
| |
New Sign Permit
|
$2.00 per sq. ft. (maximum $100.00)
|
Temporary sign permit
|
$50.00
|
Advertising Searchlight
|
$100.00
|
Miscellaneous Building Permits
| |
Electrical service upgrade/hookup (+ any required inspections)
|
$50.00
|
Utility Inspections (Meter Release) (Permanent Power Release)
|
$50.00
|
In-ground Swimming Pool (+ any required inspections)
|
$200.00
|
Permanent above-ground Swimming Pool (+ any required inspections)
|
$50.00
|
Lawn Sprinkler System (+ one inspection)
|
$50.00
|
Fire Sprinkler System (+ any required inspections)
|
$250.00
|
Demolition
|
$50.00
|
Construction Trailer Permit (includes electrical, mechanical,
and plumbing)
|
$250.00
|
Move-in Structure
|
$50.00 ($75.00/hr for police escort)
|
Accessory Building 200 sq. ft. or less
|
(+ trade permits @ $50.00 each)
|
Accessory Building larger than 201 sq. ft.
|
$25.00 (+ utility permits @ $50.00 each)
|
Patio Cover/Detached Garage
|
$25.00 (+ trade permits @ $50.00 each)
|
Commercial Grinder Pump Inspection
|
$110.00
|
Residential Grinder Pump Inspection
|
$60.00
|
Water Heater Replacement (+ one inspection)
|
$50.00
|
Air Conditioning/heater replacement (+ one inspection)
|
$50.00
|
Water Softener Installation (+ one inspection)
|
$50.00
|
All Permits not set above (Check with the Building Department)
|
$50.00
|
All Required Inspections and Reinspections
|
$65.00
|
Technology Fee
|
$15 added to all permits
|
Penalties
| |
Occupying a building without certificate of occupancy (CO) (Per
ordinance)
|
$500.00/per day
|
After 7th day occupying a building with [without] a CO (Requires
permit prior to beginning construction)
|
$500.00/per day
|
Work Without a Permit Adds dollar penalty to article 4.02 (Requires permit prior to beginning construction)
|
$500.00/per day
|
Requirement for building permit in city limits and ETJ
|
$500.00
|