"Circulation improvements"includes but is not limited to the construction of or improvement to street rights-of-way, traffic signals, over crossings, underpasses, curbs, gutters, sidewalks, street pavement, and drainage improvements incidental to street improvements necessary to provide traffic circulation consistent with the circulation component of the community development plan of the La Habra general plan 2020. For purposes of this definition street includes highway or road.
"Development"means any new construction or use that requires the issuance of a building permit or other city use entitlement and which generates additional traffic impacts above that generated by the previous use of the land.
"Development permits"means a building permit required by and issued pursuant to Chapter 15 of this code, or other city use entitlement such as but not limited to a conditional use permit, an environmental design review permit, a zone change, variance or subdivision required by Chapters 17 and 18 of this code.
"PM peak hour trip ends"means the number of one-way (in and out) vehicular trips generated by a given land use during the one-hour period of highest traffic volume during the PM peak period of 3:30-6:30 p.m.
(Ord. 1452 § 1, 1993)