For the purposes of this chapter, the following definitions shall apply:
"Applicant"means any individual, firm, limited liability company, association, partnership, political subdivision, government agency, municipality, industry, public or private corporation, or any other entity whatsoever who applies to the city for any permit, as defined in this chapter, and who is, therefore, responsible for meeting the requirements of this chapter.
"Completion"means the earliest of the following dates: the date a temporary certificate of occupancy is issued by the city for a project, the date a certificate of occupancy is issued by the city for a project, or the date the final city inspection approving the project is completed.
"Construction"means the building or enlargement of any structure, or any portion thereof, and includes without limitation alterations or improvements to an existing structure.
"Construction and demolition debris"means the excess or discarded materials, which are removed from a site during or after the construction or demolition of any structure, fence, wall, or paving.
"Conversion rate"means the rate set forth in the standardized conversion rate table for use in estimating the volume or weight of construction and demolition debris, approved by the California Integrated Waste Management Board.
"Demolition"means the razing, tearing down or wrecking of any structure, wall, fence or paving, whether in whole or in part, whether interior or exterior.
"Diversion requirement"means the diversion of a minimum of fifty percent of the total construction and demolition debris generated by a project, or the lower percentage requirement granted by exception pursuant to Section
15.78.075.
"Paving"means driveways, walkways, parking areas, streets and sidewalks.
"Performance security"means cash, certified or cashiers' check, certificate of deposit, a letter of credit or other security in a form approved by the director of public works.
"Permit"means any building or demolition permit.
"Project"means any proposal for new or changed use, or for new construction, alteration or enlargement of any structure, that requires a permit from the city of La Habra.
"Recycling" and "reuse"mean the process of collecting, sorting, cleansing, treating, and reconstituting construction and demolition debris that would otherwise be disposed of in a landfill for use as raw material for, new, reused, or reconstituted products which meet industry standards.
"Structure"means anything constructed or erected that requires a location in the ground, including a building or swimming pool, but not including a fence or wall used as a fence, or driveways, or walkways.
"Waste management plan"means an application packet approved by the director of public works for the purpose of reviewing project compliance of this chapter.
(Ord. 1630 § 1, 2003)