No person shall begin any construction project of any kind in the city without first providing one chemical toilet equipped with a seat and cover and a separate urinal, complying with the provisions of this section, on the site of the construction for the first fifteen employees or part thereof and one for each additional fifteen employees or part thereof. Each toilet structure must be enclosed on top and all sides, screened, ventilated and equipped with a self-closing door. The structure housing such toilet or toilets must have an inside area of fifteen square feet for each toilet, a minimum ceiling height of six feet six inches, and a smooth floor not less than six inches above ground level. All facilities must be kept clean and sanitary and supplied with toilet paper. All such facilities must be pumped out and recharged with a nonirritating chemical frequently enough to prevent odors or overflowing. All facilities required in this section must be maintained during the period of construction. The building official may specify the location of the structure or structures on the construction site to assure its availability to employees and to make it less offensive to occupants of surrounding property.
(Ord. 987 § 10, 1980)