The requirements for a final map shall be as follows:
(a)
If more than three sheets are used, an index showing entire subdivision, with lots numbered consecutively;
(b)
Title, name of tract, date, north point and scale;
(c)
Description of land included;
(e)
Dimensions in feet and decimals of a foot;
(f)
Dimensions of all lots;
(g)
Centerline data including bearings and distances;
(h)
Radius, tangent, arc and central angle of curves;
(i)
Suitable primary survey control points;
(j)
Location of all permanent monuments;
(k)
Ties to and names of adjacent subdivisions;
(l)
Ties to any city or county boundary lines involved;
(m)
Location of all setback lines;
(n)
Required certificates;
(o)
Net acreage of all lots of one acre or more.
(Ord. 355 § 5 (part A); 1953 Code §§ 9231—9231.15; Ord. 823 § 3, 1975)