The city council may, by ordinance or resolution, establish the costs to be charged for installation of water service by the city. If no such ordinance or resolution is in effect, or if the ordinance or resolution in effect does not cover a given size, class or type of water connection, the charge for water service installation performed by the city shall be determined by the city engineer, based upon actual costs, including, but not limited to labor, materials, and equipment. In those instances where, in the judgment of the city engineer, the best interest of the city would be served, the applicant for water service connection may be required to deposit with the city the estimated cost of such installation, prior to performance of such installation.
(Ord. 05-01 §3)