"Fee"means the share of the cost of providing facilities attributable to a particular parcel of property and may include the provision of specified facilities or dedication of land for such facilities.
"Fee area"means any area covered by a General Plan amendment, zone change, or other development approval which was granted subject to a condition that the developer pay a fee or fees.
"Final parcel map"means a recorded parcel map that is in substantial conformance with an approved or conditionally approved tentative parcel map and complies with Section
7.03.040 of this Code.
"Final tract map"means a recorded tract map that is in substantial conformance with all or a portion of an approved or conditionally approved tentative tract map and which is filed in compliance with the provisions of this Subdivision Code, the Subdivision Map Act and the Subdivision Manual.
"Flood-control work" or "drainage work"means all means of conveying or storing stormwaters, including natural watercourses, improved drainage channels, retarding basins, closed conduits or pipes, and authorized or existing flood-control channels, and also the control of sedimentation.
"Flood hazard"means the capability of flowing water or mixtures of soils and water to impair or to damage buildings and other structures, and their functions; to erode natural and modified land surfaces, including channels and watercourses; to inundate coastal land areas by either wave action or tidal forces; and to deposit eroded material on either public or private property in a damaging or impairing manner and amount.
Flood hazard, possible."Possible flood hazard" means possible extension of areas denoted as "subject to flood hazard," including also the uncertainty of degree or extent of bank erosion.
"Floodplain"means the land adjacent to a watercourse and other land areas susceptible to being inundated by water.
(Added by Ord. 95-03, 2/14/95)