home Home
code Code
Code
law Laws (7)
New Laws (7)
Law Ledger (52)
note Notes (1)
help_center Help
Help
About Us
ecode
Login
City of Santa Rosa, CA chevron_right chevron_right Code of Ordinances chevron_right Title 15 Sewers chevron_right Chapter 15-08 PRETREATMENT

Chapter 15-08 PRETREATMENT

Article I General Sewer Use Requirements
§ 15-08.010 Purpose and policy.
§ 15-08.030 Minimum standards.
§ 15-08.050 Wastewater discharge permit classification.
§ 15-08.070 Prohibited discharge standards.
§ 15-08.080 National Categorical Pretreatment Standards.
§ 15-08.090 State and Federal pretreatment standards.
§ 15-08.100 Local limits.
§ 15-08.110 City's right of revision.
§ 15-08.120 Dilution.
§ 15-08.130 Vandalism/tampering.
§ 15-08.150 Seasonal flow.
§ 15-08.170 Unusual conditions.
§ 15-08.175 Temporary suspension.
§ 15-08.180 Notice of suspension.
§ 15-08.190 Slug control plan.
§ 15-08.200 Separation of domestic and process wastestream.
§ 15-08.210 Hauled wastewater.
§ 15-08.215 Clean-up and remediation projects.
§ 15-08.220 Disposal of pretreatment sludges.
Article II Wastewater Discharge Permit Application Process
§ 15-08.230 Wastewater discharge permit.
§ 15-08.240 Authorization to discharge.
§ 15-08.250 Wastewater discharge permit/existing conditions.
§ 15-08.260 Wastewater discharge permit/new connections.
§ 15-08.270 Regulation of waste received from other jurisdictions.
§ 15-08.280 Wastewater discharge permit application contents.
§ 15-08.285 Application signatories and certification.
§ 15-08.290 Wastewater discharge permit decisions.
Article III Wastewater Discharge Permit Issuance Process
§ 15-08.300 Wastewater discharge permit issuance process.
§ 15-08.310 Wastewater discharge permit duration.
§ 15-08.340 Wastewater discharge permit contents.
§ 15-08.360 Wastewater discharge permit modification.
§ 15-08.380 Wastewater discharge permit transfer.
§ 15-08.410 Wastewater discharge permit appeals.
Article IV Analysis Requirements
§ 15-08.420 Wastewater survey.
§ 15-08.430 Sampling.
§ 15-08.450 Contents of reports on sampling and analysis.
§ 15-08.460 Analytical requirements.
Article V Reporting Requirements
§ 15-08.470 Baseline monitoring reports.
§ 15-08.475 Compliance schedule progress reports.
§ 15-08.480 Reports on compliance with categorical pretreatment standard deadline.
§ 15-08.490 Periodic compliance reports.
§ 15-08.510 Reports of potential problems.
§ 15-08.520 Reports from unpermitted users.
§ 15-08.540 Reports of changed conditions.
Article VI Compliance Monitoring
§ 15-08.550 Monitoring facilities.
§ 15-08.560 Pretreatment facilities.
§ 15-08.565 Additional pretreatment measures.
§ 15-08.566 Grease removal devices.
§ 15-08.567 Amalgam separators.
§ 15-08.570 Right of entry—Inspection and sampling.
§ 15-08.580 Unmetered waste flows.
§ 15-08.610 Timing.
§ 15-08.620 Recordkeeping.
§ 15-08.630 Confidential information.
By using eCode360 you agree to be legally bound by the Terms of Use and Privacy Policy.
eCode360: Get a Professional Subscription