Those certain documents, three certified copies of which one is file in the office of the clerk, and two in the office of the deputy director - buildings, marked and designated as California Code of Regulations Title 24, Part 2.5, 2022 California Residential Building Code, including Scope and Administration Division II, Appendix I "Patio Covers" based on the 2021 International Residential Building Code as published by the International Code Council and amended by the California Building Standards Commission is hereby adopted by reference and, except as herein otherwise provided, are applicable to and shall cover all construction within the unincorporated area of the county of Merced.
(Ord. 2024 § 3, 2022)
A. 
For Section R401.4.1.1 and Table 4.1, soils investigations will not be required for single-family dwellings and residential structures, where the soils capacity is 1,500 psi or greater.
B. 
All continuous concrete footings shall contain a minimum of two continuous No. 4 steel reinforcing bars placed horizontally, one top and one bottom, regardless of exceptions listed in the 2021 International Building Code/2022 California Building Code.
(Ord. 2024 § 3, 2022)
A. 
The following words and phrases as used in this section are defined as follows:
"Electronic submittal"
means the utilization of one or more of the following:
a. 
E-mail;
b. 
The Internet;
c. 
Facsimile.
"Small residential rooftop solar energy system"
means all of the following:
a. 
A solar energy system that is no larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal.
b. 
A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the county and paragraph (iii) of subdivision (c) of Section 714 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time.
c. 
A solar energy system that is installed on a single-or duplex-family dwelling.
d. 
A solar panel or module array that does not exceed the maximum legal building height as defined by the authority having jurisdiction.
"Solar energy system"
has the same meaning set forth in paragraphs (1) and (2) of subdivision (a) of Section 801.5 of the Civil Code, as such section or subdivision may be amended, renumbered, or re-designated from time to time.
B. 
Section 65850.5 of the California Government Code provides that, on or before September 30, 2015, every city, county, or city and county shall adopt an ordinance that creates an expedited, streamlined permitting process for small residential rooftop solar energy systems.
C. 
Section 65850.5 of the California Government Code provides that in developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which small rooftop solar energy systems shall comply to be eligible for expedited review. The building official is hereby authorized and directed to develop and adopt such checklist.
D. 
The checklist shall be published on the county's internet website. The applicant may submit the permit application and associated documentation to the Merced County building and safety division by personal, mailed, or electronic submittal together with any required permit processing and inspection fees. In the case of electronic submittal, the electronic signature of the applicant on all forms, applications and other documentation may be used in lieu of a wet signature.
E. 
Prior to submitting an application, the applicant shall:
1. 
Verify to the applicant's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and
2. 
At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads.
F. 
For a small residential rooftop solar energy system eligible for expedited review, only one inspection shall be required, which shall be done in a timely manner and may include a consolidated inspection by the building official. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized; however, the subsequent inspection need not conform to the requirements of this subsection.
G. 
An application that satisfies the information requirements in the checklist, as determined by the building official, shall be deemed complete. Upon receipt of an incomplete application, the building official shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
H. 
Upon confirmation by the building official of the application and supporting documentation being complete and meeting the requirements of the checklist, the building official shall administratively approve the application and issue all required permits or authorizations. Such approval does not authorize an applicant to connect the small residential rooftop energy system to the local utility provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider.
(Ord. 2024 § 3, 2022)