A.
All new lot subsurface sewage disposal system plans must be prepared by a professional engineer registered in the State of Connecticut.
B.
The septic permit and review fee schedule is subject to revision periodically with final approval from the Redding Board of Selectmen.
C.
All permits to construct a septic system shall be valid for a period of one year from the date of issue. The permit shall expire upon failure to start construction within that period. Permits may be renewed for an additional one-year period by the Director of Health if a reason for failure to start construction within a one-year period is demonstrated. Accounting for State Health Code revisions all septic permit renewals must comply with the current code in effect at the time of permit issuance.
D.
Before a permit to discharge is issued the Redding Health Department shall be provided with an as-built diagram drawn and submitted by the engineer of record and an as-built drawing from the septic installer of record.