[Ord. No. 2727, Added, 11-1-2016; Ord. No. 2890, Amended, 3-17-2022; Ord. No. 2894, Amended, 5-3-2022; Ord. No. 2916, Amended, 11-15-2022]
1. BUILDING OFFICIAL CERTIFIED DECONSTRUCTION CONTRACTOR DECONSTRUCTION DEMOLITION OR DEMOLISH EXTERIOR WALL
Definitions.
Means the person appointed by the City Manager to enforce the provisions of the Building Code, or designee.
Means as defined in LOC § 24.06.020.
Means as defined in LOC § 24.06.020.
Means removal of 50% or more of the total surface area of exterior walls or perimeter foundation of a residential structure as it existed on June 2, 2022, either as a single project or cumulatively over five years or less.
For the purpose of this section means a wall enclosing a dwelling that has a surface exposed to the outside, including all framing and sheathing, from top plate to bottom plate on all stories.
2.
The owner of real property upon which a dwelling exists that the owner intends to demolish shall:
a.
Not less than 15 consecutive days before commencing work to demolish the dwelling, complete a written certification that the property will be posted and abutting property owners notified pursuant to subsection (2)(b) of this section, and submit the certification to the Building Official;
b.
Not less than 14 consecutive days before commencing work to demolish a dwelling:
i.
Post a public sign displaying a notice of demolition (form of sign available from the Building Official) on the subject property or access easement abutting the property, in a location that is clearly visible and readable from vehicles traveling on a public street and to persons walking by the property; and
ii.
Mail a notice of demolition (form of notice available from the Building Official) to the street address of each abutting residential property informing residents of the demolition; and
c.
Maintain the posting for 14 consecutive days following the posting of the property and until the demolition commences.
3.
Notice of Demolition. The posted and mailed notices of demolition shall state that the owner intends to commence demolition for the dwelling(s) on the property, and include the date of posting or mailing, planned date or dates of demolition, and contact information for the owner.