All work done under the provisions of this title shall be subject to inspection by the City. Up to the time of the inspection all work shall remain uncovered and convenient for the inspector's examination. If any pipes are enclosed or covered in any way whatsoever, so as to tend to obstruct a thorough inspection of the drainage system, said obstruction must be removed upon notice to do so from the City, before an inspector shall be required to inspect the work. When, upon examination by the inspector, it appears that any such work is defective, either in its construction or material, the same shall be made to conform to the approved plans.
(Ord. 438 § 2, 2004)
All piping and all joints shall pass an air pressure test as per UPC 318. After backfilling and compaction, the pipeline shall also pass a mandrel test. Television inspection shall also be required.
(Ord. 438 § 2, 2004)
When it appears to the satisfaction of the City that any work authorized by these regulations has been constructed according to, and meets the requirements of, all provisions of this title and other applicable laws, and that all the fees for the doing and inspection thereof have been paid, the City shall cause to be issued to the person, firm or corporation constructing such work a certificate of final inspection.
(Ord. 438 § 2, 2004)