This chapter sets forth the form, contents, submittal, approval, and filing of parcel maps.
(Ord. 91-9 § 3)
Where a parcel map is required, such map shall be based upon a field survey made in conformity with the Land Surveyors Act or be compiled from recorded or filed data when sufficient survey information exists on filed maps to locate and retrace the exterior boundary lines of the parcel map if the location of at least one of these boundary lines can be established from an existing monumented line. All monuments, property lines, center lines of streets, alleys and easements adjoining or within the subdivision shall be tied into the survey.
(Ord. 91-9 § 3)
The form and contents of the parcel map shall conform to the requirements in Sections 16.28.020 through 16.28.040.
(Ord. 91-9 § 3)
The subdivider shall submit prints of the parcel map to the city engineer for checking. The preliminary prints shall be accompanied by copies of the data, plans, reports and documents as required by Section 16.28.050. The city engineer and community development director may waive any of the requirements if the location and nature of the proposed map does not justify compliance with Sections 16.28.020 through 16.28.040.
(Ord. 91-9 § 3)
The subdivider shall submit to the city engineer the original tracing of the map and any duplicates as per city requirements, corrected to its final form and signed by all parties required to execute the certificates, statements and acknowledgements on the map. Original signatures shall appear on the original drawing. Upon receipt of all required certificates and submittals, the city engineer shall sign the appropriate statements and transmit the original map to the city clerk. The city surveyor shall also sign the appropriate statement if the land surveying functions of the city engineer are performed by the city surveyor.
(Ord. 91-9 § 3)