[Ord. 2023-01, 4/19/2023]
1.
For any regulated activity, unless exempt per the provisions of § 19-106:
A.
Preparation and implementation of an approved SWM site plan is required.
B.
No regulated activity shall commence until the municipality issues written approval of a SWM site plan, which demonstrates compliance with the requirements of this chapter and, if required, a letter of adequacy has been issued by the Conservation District for an erosion and sediment control plan.
C.
The preliminary or final approval of subdivision and/or land development plans and the issuance of any building or occupancy permit shall not proceed until the applicant has received written approval of a SWM site plan from the municipality.
D.
The SWM site plan approved by the municipality shall be on site throughout the duration of the regulated activity.
E.
Individual on-lot BMPs (serving only one residential lot) which meet the design criteria to utilize the Simplified Approach for Stormwater Management for Small Projects[1] with less than 10,000 square feet of proposed earth disturbance and less than 2,000 square feet of regulated impervious surfaces shall meet the reduced plan requirements of § 19-402, Subsection 3.
[1]
Editor's Note: See Appendix A, included as an attachment to this chapter.