[Ord. 2023-01, 4/19/2023]
1. Fees have been established by the municipality as adopted by Resolution No. 2021-04, as may be amended from time to time, or as otherwise allowed by law, to defray plan review and construction inspection costs incurred by the municipality. All fees listed in §
19-602, Subsection
1, shall be paid by the applicant at the time of SWM site plan submission.
2. Fees shall be based on the municipality's costs for reviewing SWM site plans, O&M plans and agreements and as-built plans, and conducting inspections pursuant to §
19-501. The municipality shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
[Ord. 2023-01, 4/19/2023]
1. The fees required of the applicant by this chapter shall, at a minimum,
cover:
B. The review of the SWM site plan by the municipality, the Municipal
Engineer and other municipal consultants;
C. Coordination and meetings with the applicant;
D. The inspection of erosion and sediment control measures, BMPs, conveyances
and other related improvements during construction;
E. Review of project communications, reports, and additional supporting
information;
G. The final inspection upon completion of the BMPs, conveyances, and
other stormwater management facilities and related improvements presented
in the SWM site plan; and
H. Review of final as-built plan submission and revised calculations
and inspections, as needed.
2. The applicant shall also reimburse all expenses incurred by the municipality
for any additional work or municipal consultant fees required to enforce
any permit provisions regulated by this chapter, correct violations,
and ensure proper completion of remedial actions.