The governing body of the municipality finds that:
A.
Inadequate management of accelerated stormwater runoff resulting from development throughout a watershed increases runoff volume, flood flows, and velocities, contributes to erosion and sedimentation, degrades water quality, overtaxes the carrying capacity of streams and storm sewers, greatly increases the cost of public facilities to convey and manage stormwater, undermines floodplain management and flood reduction efforts in upstream and downstream communities, reduces groundwater recharge, and threatens public health and safety, and increases nonpoint source pollution of water resources.
B.
A comprehensive program of stormwater management, including reasonable regulation of development and activities causing accelerated erosion, is fundamental to the public health, safety, welfare, and the protection of the people of the municipality and all the people of the commonwealth, their resources, and the environment.
C.
Through project design, impacts from stormwater runoff can be minimized to maintain the natural hydrologic regime and sustain high water quality, groundwater recharge, stream base flow, and aquatic ecosystems. The most cost-effective and environmentally advantageous way to manage stormwater runoff is through nonstructural project design, minimizing impervious surfaces and sprawl, avoiding sensitive areas (i.e., stream buffers, floodplains, steep slopes), and designing to topography and soils to maintain the natural hydrologic regime.
D.
Stormwater is an important resource that provides groundwater recharge for water supplies and supports the base flow of streams.
E.
The use of green infrastructure and low-impact development (LID) is intended to address the root cause of water quality impairment by using systems and practices which use or mimic natural processes to 1) infiltrate and recharge, 2) evapotranspire, and/or 3) harvest and use precipitation near where it falls to earth. Green infrastructure practices and LID contribute to the restoration or maintenance of predevelopment hydrology.
F.
Federal and state regulations require this municipality to obtain a permit for discharges from its MS4 under the NPDES program; and to implement a program of stormwater controls.