The applicant shall provide a financial guarantee to the municipality for the timely installation and proper construction of all stormwater management controls as required by the approved stormwater management site plan and this chapter equal to the full construction cost of the required controls plus construction contingency and construction inspection costs; in accordance with the provisions of Sections 509, 510, and 511 of the Pennsylvania Municipalities Planning Code.[1]
[1]
Editor's Note: See 53 P.S. §§ 10509, 10510 and 10511.