The components and subsystems required to convert solar energy into electric energy are suitable for use. The area of the system includes all the land inside the perimeter of the system, which extends to any fencing. Solar energy systems are divided into two classes for these zoning regulations.
A.
Level 1 solar energy system. A roof-mounted system on any code-compliant structure or any ground-mounted system on an area of up to 50% of the footprint of the primary structure on the parcel but not more than one acre and not more than 25 feet tall or any building integrated system (i.e., shingle, hanging solar, canopy, etc.).
B.
Level 2 solar energy system. Any ground-mounted system not included in a Level 1 SES and meets the following area restrictions:
(1)
In an agricultural zone, the area of the SES shall not exceed one acre in size and shall require a building permit issued by the Henderson County Codes Department.
(2)
In an industrial zone, an SES of any size shall require a site plan approved by the Henderson City-County Planning Commission. If no building permit is issued within one year of the approved site plan, then the site plan is subject to another review by the Planning Commission. (Updated June 2023.)