For purposes of this chapter, the following words and phrases shall have the meanings set out in this section:
"Approval"means a written professional opinion by the responsible principal of record concerning the satisfactory progress and completion of the work under this purview unless it specifically refers to the city engineer.
"Approved plans"means the most current grading plans which bear the signature of approval of the city engineer.
"Approved testing agency"means a facility which spends the majority of its time in the field of applied soil mechanics and foundation engineering; which is equipped to perform and certify the tests and procedures required in this chapter; and which operations are conducted under the responsible supervision of a registered civil engineer.
"As-graded"means the surface configuration upon completion of grading.
"Bench"means a relatively level step excavated into earth material on which fill is to be placed.
"Borrow"means earth material acquired from an off-site location for use in grading on a site.
"City engineering"means the city engineer of the city of Rancho Mirage or his duly authorized representatives.
"City engineer"means a professional engineer registered in the state of California to practice in the field of civil engineering.
"Civil engineering"means the application of the knowledge of the forces of nature, principles of mechanics, and the properties of materials to evaluation, design and construction of civil works for the beneficial uses of mankind.
"Compaction"means the densification of a fill by mechanical or other acceptable means.
"Earth material"means any rock, natural soil, or fill, and/or any combination thereof.
"Engineering geologic report"means a report prepared under the supervision of an engineering geologist providing a geologic map of a site, information on geologic measurements and exploration performed on the site and surrounding area and providing recommendation for remedial measures necessary to provide a geologically stable site for its intended use.
"Engineering geology"means the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil work.
"Erosion"means the process by which the ground surface is worn away as a result of the movement of wind or water.
"Erosion control system"means any combination of desilting facilities, retarding basins and erosion protection, including effective planting and the maintenance thereof, to protect adjacent private property, watercourses, public facilities and receiving waters from the deposition of sediment or dust.
"Evacuation"means any act by which soil, sand, gravel or rock is cut into, dug, quarried, uncovered, removed or relocated, and shall include the conditions resulting therefrom.
"Fault"means a fracture in the earth's crust along which movement has occurred. A fault is considered active if movement has occurred within the past eleven thousand years (Holocene geologic time).
"Fill or embankment"means a deposit of soil, sand, gravel, rock or other material placed by artificial means.
"Geohydrology"means all groundwater, information, well development requirements and seepage evaluations, appropriate to site development.
"Geotechnical report"means a report which contains all appropriate soil engineering, geologic, geohydrologic, and seismic information, evaluation, recommendations and findings. This type report combines both engineering geology and soil engineering reports.
"Grade"means the vertical elevation of the ground surface.
b. Finish grademeans the final grade of the site which conforms to the approved plan.
d. Rough grademeans the stage at which the grade approximately conforms to the approved plan.
"Grading"is any process of excavation or filling or combination thereof.
"Grading contractor"means a contractor licensed and regulated by the state of California who specializes in grading work or is otherwise licensed to do grading work.
"Key"means a designed compact fill placed in a trench excavated in earth material beneath the toe of a proposed fill slope.
"Keyway"means an excavated trench into competent earth material beneath the toe of the proposed fill slope.
"Landslide"means the downward and outward movement of soil, sand, gravel, rock or fill or a combination thereof.
"Owner"means any person, agency, firm or corporation having a legal, possessory or equitable interest in a given real property.
"Permittee"means any person or owner to whom a permit is issued pursuant to this code.
Permit, finish grading."Finish grading permit" means a permit that is issued on the basis of approved plans which show the precise locations of structures, finish elevations, drainage details and all on-site improvements on a given property.
Permit, rough grading."Rough grading permit" means a permit that is issued on the basis of approved plans which show the precise locations of structures, finish elevations, drainage details and all on-site improvements on a given property.
References.Unless indicated otherwise, references in this code to civil engineer, soil engineer, geologist, landscape architect and engineering geologist refer to the professional person(s) preparing, signing or approving the project plans and specifications which comprise the approved grading or landscape-irrigation plan, or his successor appearing pursuant to Section 25.64.410.
"Resource conservation area"means:
b. Scenic corridor zones or other area officially designated by federal, state or local governments as scenic areas;
c. Areas of severe geologic hazard;
"Retaining wall"means a wall designed to resist the lateral displacement of soil or other materials.
"Site"means any lot or parcel of land or contiguous lots or parcels, or combination thereof, where grading is performed or permitted.
"Slope"means an inclined ground surface of a fill, excavation, or natural terrain, the inclination of which is expressed as a ratio of horizontal distance to vertical distance. The height of a slope is the vertical measurement taken from the toe of the slope to the top of the slope.
Slope stability.a. Gross stabilitymeans the factor of safety against failure of slope material located below a surface approximately three to four feet deep, measured from and perpendicular to the slope face.
b. Surficial stabilitymeans the factor of safety against failure of the outer three to four feet of slope material measured from and perpendicular to the slope face.
"Soil"means earth material of whatever origin, overlying bedrock and may include the decomposed zone of bedrock which can be readily excavated by mechanical equipment.
"Soil engineer"means a civil engineer duly registered in the state of California, who:
a. Is engaged in the practice of civil engineering and spends a majority of his time in the field of applied soil mechanics and foundation engineering;
b. Has at least four years of responsible practical experience in the field of applied soil mechanics;
c. Has access to an adequately equipped soils testing laboratory;
"Soil engineering"means the application of the principles of soil mechanics in the investigation, evaluation, and design of civil works involving the use of earth materials and the inspection and testing of the construction thereof.
"Soils engineering report"means a report prepared under the responsible supervision of a soils engineer which includes:
a. Preliminary information concerning engineering, properties of soil and rock on a site prior to grading, describing locations of these materials and providing recommendations for preparation of the site for its intended use;
b. Grading report including information on site preparation, compaction of fills placed, providing recommendations for structural design and approving the site of its intended use.
"Stockpile"means a temporary, uncompacted fill or embankment placed by artificial means, which is designated or intended to be moved or relocation at a later date.
"Suitable material"is any soil or earth material which, under the criteria of this chapter or under the criteria of an approved geotechnical report, is suitable for use as fill or for any other intended purpose.
"Sulfate (SO4)"means a chemical compound occurring in soil or water, which in concentration has a corrosive effect on ordinary Portland cement concrete and some metals.
"Terrace"means a relatively level step constructed in the face of a graded slope surface for drainage and maintenance purposes.
"Uniform Building Code (U.B.C.)"shall be the latest edition of the UBC adopted by the city of Rancho Mirage, published by the International Conference of Building Officials.
"Unsuitable material"shall be any soil or earth material having properties or characteristics which, under the criteria of this chapter or under the criteria continued in any approved geotechnical report, make it unsuitable for use as fill or for any other intended use. There properties or characteristics include but are not limited to: organic content of the material exceeds three percent; rock diameters exceeding eight inches, the presence of concrete or asphalt, or the presence of expansive soils within four feet of finish grade of any area intended or designed as a location for a building.
(Ord. 398 § 4, 1987)