As used in this chapter:
shall include:
New construction which generates additional traffic impacts from those generated by the previous use of the land;
Conversion of one use to a new use when the new use generates an additional traffic impact when compared to the previous use as indicated by the trip generation data presented by the Institute of Transportation Engineers (ITE) in their reference text entitled "Trip Generation," latest edition;
Expansion of an existing use at its current location or at a different location;
A new use in an existing structure when the previous use relocated to a parcel with identical ingress and egress as the previous location (regardless of intensity of traffic use);
A use which relocates to another location having the same ingress and egress as the previous location shall not be considered as "new development," unless the relocation resulted in an expansion of the use, in which case only the expansion of the use shall be considered as "new development";
Any other use upon which a condition was imposed on a required conditional use permit that the use be required to pay the street improvement fee.
shall include every person, firm or corporation constructing new development, directly or through the services of any employee, agent, independent contractor, or otherwise.
(O4127; O93-017)