The connection of the building sewer to the public sewer shall be made at the termination of the sewer lateral, if such lateral is available. If an existing sewer lateral is unavailable, and a public sewer main is available, a lateral sewer will be constructed by the City to connect to the public sewer main providing that all fees and connection charges are paid as required by this chapter, All such connections shall be made gastight and watertight and shall be tested, if required by the Building Official, for leakage. The applicant for the building sewer permit shall notify the Building Official when the building sewer is ready for connection to the public sewer. The connection and testing shall be done by the applicant and it shall be inspected and approved by the Building Official or authorized representative.
(Ord. 249 § 408, 1979; Ord. 299 § 1, 1986; Ord. 559 § 1, 2017)