All drainage facilities shall be designed and engineered to prioritize the retention, detention, and infiltration of water on-site and be consistent with, where applicable, the West Placer and East Placer Storm Water Quality Design Manuals. Any surface and subsurface waters not able to be retained, detained, and/or infiltrated on-site shall be carried to the nearest adequate street, storm drain, natural watercourse, or other juncture.
(Ord. 5056-B, 2000; Ord. 5373-B, 2005; Ord. 5824-B § 5, 2016; Ord. 5917-B § 3, 2018)