A fee of ten dollars shall be paid to the director of finance or his or her authorized representative at the time an application for a permit is filed under the provisions of Section
15.12.020. In addition to the permit fee of ten dollars, all main sewer construction applicants shall pay an inspection fee at the rate of twenty-five cents per lineal foot of sewer main constructed. An additional fee of twenty-five dollars shall be paid in the event a sewer pipe saddle is required and installed. In the event that any sewer connection requires excavation under a public sidewalk or other public improvement an additional fee of fifteen dollars shall be paid. Over and above all other fees provided for herein, an additional fee of twenty-five dollars shall be paid for the inspection of installation of manholes, junction structures, and any other structures constructed on the sewer line.
(Prior code § 16.13; Ord. 1043 § 2, 1967; Ord. 1542 § 1, 1989)