Lot line adjustment applications must be filed on forms provided
by the director, together with required filing fees and other information
required by the director to allow for review of the application.
(Ord. 2189 § 1, 2020)
Within twenty-four months after the director approves a lot
line adjustment, all record owners must cause to be recorded with
the office of the Los Angeles County recorder either a grant deed
or quit claim deed reflecting the adjustment. No record of survey
is required for a lot line adjustment. However, the legal descriptions
provided on the deed or deeds must be prepared by a licensed surveyor,
licensed in the state of California, or qualified registered civil
engineer.
(Ord. 2189 § 1, 2020)