The procedure and practice of all survey work done on any subdivision, whether for preparation of a final map or parcel map shall conform to the standard practices and principles of land surveying, the California Land Surveyor's Act, and the provisions of this chapter. All related documents shall be executed by a California-registered civil engineer authorized to do land surveying or licensed land surveyor. Whenever the city engineer has established a system of coordinates and/or monuments which is within a reasonable distance of the subdivision boundary, as determined by the city engineer, the field survey shall be tied into the system.
(Ord. 1567)