This ordinance shall be known as the "Street Trench Fee" ordinance.
(SCC 1145 § 2, 1999)
TRENCH CUT FEE SCHEDULE FOR TRENCHES LESS THAN 4 FEET DEEP | |||||
|---|---|---|---|---|---|
Major Streets1 or all streets within 5 years of construction or structural overlay | PCI between2 | 100 | and | 70 | $3.90 per S.F. longitudinal |
Major | PCI between | 69 | and | 26 | $7.80 per S.F. transverse |
$2.20 per S.F. longitudinal | |||||
Major | PCI between | 25 | and | 0 | $4.40 per S.F. transverse |
NO FEE | |||||
Other | PCI between | 100 | and | 70 | |
$2.41 per S.F. longitudinal | |||||
Other | PCI between | 69 | and | 26 | $4.82 per S.F. transverse |
$1.18 per S.F. longitudinal | |||||
Other | PCI between | 25 | and | 0 | $2.36 per S.F. transverse |
NO FEE | |||||
1 | Major = thoroughfare and arterial roads as defined by the County Improvement Standards |
2 | PCI = Pavement Condition Index |
Fees do not apply to area outside of the vertical projection of the trench in a "T" cut restoration | |
Longitudinal = Trench mostly parallel to the centerline of the ramp | |
Transverse = Trench mostly perpendicular to the centerline of the road |
TRENCH CUT FEE SCHEDULE FOR TRENCHES 4 FEET DEEP OR GREATER | |||||
|---|---|---|---|---|---|
Major Streets1 and streets within 5 years of construction or structural overlay | PCI between2 | 100 | and | 70 | $ 5.91 per S.F. longitudinal |
Major | PCI between | 69 | and | 26 | $ 11.82 per S.F. transverse |
$ 3.34 per S.F. longitudinal | |||||
Major | PCI between | 25 | and | 0 | $6.68 per S.F. transverse |
NO FEE | |||||
Other | PCI between | 100 | and | 70 | $3.66 per S.F. longitudinal |
$7.32 per S.F. transverse | |||||
Other | PCI between | 69 | and | 26 | $1.80 per S.F. longitudinal |
$3.60 per S.F. transverse | |||||
Other | PCI between | 25 | and | 0 | NO FEE |
1 | Major = thoroughfare and arterial roads as defined by the County Improvement Standards |
2 | PCI = Pavement Condition Index |
Fees do not apply to area outside of the vertical projection of the trench in a "T" cut restoration | |
Longitudinal = Trench mostly parallel to the centerline of the ramp | |
Transverse = Trench mostly perpendicular to the centerline of the road |