All facilities shall be constructed, installed and located in accordance with the following terms and conditions, unless otherwise specified in a franchise agreement:
A.
All new telecommunication facilities shall be installed underground unless the Public Works Director determines that extraordinary circumstances require overhead installation.
B.
A grantee shall install its utility facilities within an existing underground duct or conduit whenever excess capacity exists within such utility facility.
C.
A grantee with permission to install overhead facilities shall install its telecommunications facilities on pole attachments to existing utility poles only, and then only if surplus space is available.
D.
Whenever any existing electric utilities, cable facilities or telecommunications facilities are located underground within a public way of the City, a grantee with permission to occupy the same public way must also locate its utility facilities underground.
E.
Whenever any new or existing electric utilities, cable facilities or telecommunications facilities are located or relocated underground within a public way of the City, a grantee that currently occupies the same public way shall relocate its facilities underground within a reasonable period of time, which shall not be later than the end of the grant term. Absent extraordinary circumstances or undue hardship as determined by the City Engineer, such relocation shall be made concurrently to minimize the disruption of the public ways.
F.
All new utility facilities shall be installed so as to have no adverse effect on motor vehicle or pedestrian safety and access, or on the operation, maintenance and aesthetic quality of the public ways system.