A. 
The provisions in this chapter shall govern the monumentation required for final and parcel maps.
B. 
In making the survey of a subdivision for a final or parcel map, the engineer or surveyor shall set sufficient permanent monuments so that the survey, or any part thereof, may be readily retraced. The survey shall include measured connections (ties) into the City's Survey Control Network approved by the City Engineer, in accord with the provisions of Section 27.10.080 of this chapter.
(Ord. 3790 §1, 1975; Ord. 5120, 1999)
A. 
Monuments shall be set on the exterior boundary of the subdivision at all corners, angle points, beginnings and ends of curves and at intermediate points approximately 1,000 feet apart. The locations of inaccessible points may be established by ties and shall be so noted on the final map or parcel map.
B. 
All exterior boundary monuments shall be set prior to recordation of the final or parcel map unless extensive grading operations or improvement work makes it impractical to set such monuments. In the event any or all of the boundary monuments are to be set after recordation of the final map or parcel map, prior to the submission of such map to the City Engineer for filing, the engineer or surveyor making the survey shall, in addition to furnishing field notes showing the boundary survey, furnish evidence acceptable to the City Engineer to substantiate his or her reasons for deferring the setting of such monuments until after recordation of such map.
(Ord. 3790 §1, 1975; Ord. 5380, 2005)
Monuments shall be set at all block and lot corners and angle points and at the beginnings and ends of curves, and along street and alley centerlines at the beginnings and ends of curves, at points of intersection with centerlines of other existing and proposed streets and alleys, and at the points of intersection with the exterior boundary lines. Interior property line and centerline monuments and ties may be set after the final map or parcel map is recorded.
(Ord. 3790 §1, 1975)
A. 
In the event any or all of the required monuments are to be set after recordation of the final map or parcel map, the engineer's or surveyor's certificate shall specify the date, established by the City Engineer, by which the monuments will be set and the field notes thereon furnished, and the subdivider shall, prior to the submission of such map to the City Engineer for filing, furnish to the City Engineer a security as required by Section 27.11.020. In lieu thereof, provision for the setting of said monuments may be included in the agreement prepared in accordance with Section 66462 of the Subdivision Map Act.
B. 
In the event the deferred monuments are not set within the period of time specified on the engineer's or surveyor's certificate, or within any approved extended period of time, and provided that all improvement work has been completed, the City Engineer shall by written notice forthwith direct the engineer or surveyor of record to within 60 days of the date of such directive set such monuments and furnish such field notes as were agreed to be set and furnished on said certificate. If the engineer or surveyor fails to comply with said directive within the specified time, and if no request for an extension of time has been submitted in writing and granted within such time, the City Engineer shall without further notice submit a written complaint and request for disciplinary action against said engineer or surveyor to the State Board of Registration for Civil and Professional Engineers.
(Ord. 3790 §1, 1975; Ord. 5380, 2005)
All monuments set as required herein shall be permanently and visibly marked or tagged with the registration or license number of the engineer or surveyor who signs the engineer's or surveyor's certificate and under whose supervision the survey was made.
(Ord. 3790 §1, 1975)
Any monument set as required herein which is disturbed or destroyed before acceptance of all improvements by the City shall be replaced by the subdivider's engineer or surveyor.
(Ord. 3790 §1, 1975)
The following survey data and information shall be shown on each final or parcel map for which a field survey was made pursuant to the provisions of these regulations:
A. 
Stakes, monuments (together with their precise position) or other evidence found on the ground to determine the boundaries of the subdivision.
B. 
Corners of all adjoining properties identified by lot and block numbers, subdivision names, numbers and page of record or by section, township and range or other proper designation.
C. 
All information and data necessary to locate and retrace any point or line without unreasonable difficulty.
D. 
The location and description of any required monuments to be set after recordation of the final map, and the statement that they are "to be set."
E. 
Bearing and length of each lot line, block line and boundary line and each required bearing and distance.
F. 
The centerlines of any street or alley in or adjoining the subdivision which have been established by the City Engineer together with reference to a field book or map showing such centerline and the monuments which determine its position. If determined by ties, that fact shall be stated.
G. 
Such other survey data or information as may be required to be shown by the City Engineer or by the provisions of this section.
(Ord. 3790 §1, 1975; Ord. 5380, 2005)
The following standards shall apply to each final map and each parcel map for which a field survey is made pursuant to these regulations:
A. 
The engineer or surveyor shall be required to tie the boundary of a final map or parcel map into the City of Santa Barbara 1995 Survey Control Network, filed with the Santa Barbara County Surveyor and recorded in the office of the Santa Barbara County Recorder in Book 147, Pages 70, 71, 72, 73 and 74, or other Survey Control Network approved by the City Engineer and recorded in the office of the Santa Barbara County Recorder. The map shall include measured connections (ties) to no less than two recorded locations, on opposite sides of the boundary, or as otherwise approved by the City Engineer.
B. 
The provisions of this section are satisfied if the boundary of the parcel map or final map being submitted is a parcel or lot of a map which is already tied, in accord with professional surveying practice, to the City of Santa Barbara 1995 Survey Control Network or Survey Control Network approved by the City Engineer and recorded with the office of the Santa Barbara County Recorder.
(Ord. 5120, 1999)