A.
Establishment. It shall be the duty of the Zoning Administrator to administer and enforce this chapter and to take all actions that are required by this chapter.
B.
Enforcement. If the Zoning Administrator finds that this chapter is being violated, he/she shall notify in writing the person responsible for such violations, indicate the nature of the violation and order action necessary to correct it. The Zoning Administrator shall:
(1)
Order discontinuance of the illegal use of land, buildings, or structures;
(2)
Order removal of illegal buildings or structures or of additions, alterations, or structural changes thereto;
(3)
Order discontinuance of any illegal work being done; or
(4)
Take any other action authorized to ensure compliance or to prevent violation.
C.
Issuance of permits. The Zoning Administrator shall issue permits for the erection, construction, addition, demolition, moving or structural alteration of buildings and structures and for the use of land.
[Amended 12-8-2014 by Ord. No. 11052014; 7-13-2020 by Ord. No. 2020-004; 8-14-2023 by Ord. No. 2023-002; 5-22-2023 by Ord. No. 2023-003]
(1)
"Level 1 permits" shall be defined as projects having a minor zoning impact and shall include, but not be limited to: fences, walls, siding, windows, roofs, steps, stairs, solar panels, signs, water and/or sewer service change, and demolition.
(2)
"Level 2 permits" shall be defined as projects having a major zoning impact and shall include, but not be limited to: additions, new structure or building, accessory structure, renovation, pool, deck, porch, paver patio, driveway, parking lot, or change of use.
(3)
Level 2 applications for permits for projects in which the value of the work to be performed exceeds $7,500 shall be referred to the Planning Commission. The Planning Commission shall promptly review such applications and make a recommendation regarding approval or disapproval. The Planning Commission may not issue a permit unless such permit is approved by a majority vote as set forth in § 120-2.1.2D(5) herein. All Level 1 applications for permits regardless of value, as well as Level 2 applications for permits for projects in which the value of work does not exceed $7,500, need not be referred to the Planning Commission and permits may be issued by the Zoning Administrator without Planning Commission approval unless the Zoning Administrator requests Planning Commission review, or unless Planning Commission approval is specifically required by a provision of this chapter.
(4)
No building or other structure shall be erected, moved, added to, or structurally altered, or use of land shall be changed, without a permit authorizing such work.
(5)
No permit shall be issued except in conformity with this chapter.
D.
Notice to Critical Area Commission. When the Town receives an application for any development, subdivision, site plan, rezoning, special exception, variance, or timber harvesting pertaining to land in the critical area, the Zoning Administrator shall send official notification thereof and a copy of the application to the Critical Area Commission, except that referral to the Critical Area Commission shall not be required when:
[Amended 5-22-2023 by Ord. No. 2023-003]