[Ord. 429, 11/7/2006]
1.
The Borough Engineer or his Borough assignee shall observe all phases of the installation of the permanent stormwater management facilities as deemed appropriate by the Borough Engineer.
2.
During any stage of the work, if the Borough Engineer determines that the permanent stormwater management facilities are not being installed in accordance with the approved stormwater management plan, the Borough shall revoke any existing permits until a revised drainage plan is submitted and approved, as specified in this Chapter.