[Ord. 429, 11/7/2006]
The applicant should provide a financial guarantee to the Borough for the timely installation and proper construction of all stormwater management controls as required by the approved Delaware River South Stormwater Management Plan and this Chapter equal to the full construction cost of the required controls.