It is declared to be the policy of the city that all utility services shall be underground from the curbline to a meter box on any lots or parcels hereafter improved with construction or erection of any building.
(Prior code § 13-201)
Any owner, lessee, agent, or other person constructing or arranging for the erection or construction of any building or other structure in the city utilizing electricity shall provide for the undergrounding of all utilities between the curb and the service meter. The building inspector shall deny final approval and acceptance and shall refuse to allow final public utility connection to any such building or structure unless such utilities are undergrounded or unless money or a bond to guarantee their construction is deposited with the city in the sum equal to the estimated cost of the construction of such improvements as determined by the public works department of the city.
(Prior code § 13-202)
The undergrounding of utilities as described in Sections 12.28.010 and 12.28.020 shall not apply to any building or dwelling a permit for construction of which was issued prior to November 15, 1973.
(Prior code § 13-203)