In addition to the findings for approval or conditional approval of a coastal development permit, development authorization, or other entitlement as required by these coastal zone zoning regulations, the following supplementary findings, based on factual evidence, shall be made for new development or uses occurring in or adjacent to ESHA:
A. Generally. All approved development will be, or has been conditioned to be, consistent with the development standards of Section
17.84C.060, as applicable.
B. Development within non-wetland ESHA. The development or use is:
1. Dependent on the resources within and/or supported by the ESHA; and
2. The environmentally sensitive habitat shall be protected against any significant disruption of habitat values.
C. Development within coastal wetland ESHA other than rivers and streams.
1. The development or use is:
a. For one or more of the following permissible uses:
i. New or expanded port, energy, and coastal-dependent industrial facilities, including commercial fishing facilities.
ii. Maintaining existing, or restoring previously dredged, depths in existing navigational channels, turning basins, vessel berthing and mooring areas, and boat launching ramps.
iii. In open coastal waters, other than wetlands, including streams, estuaries, and lakes, new or expanded boating facilities and the placement of structural pilings for public recreational piers that provide public access and recreational opportunities.
iv. Incidental public service purposes, including but not limited to, burying cables and pipes or inspection of piers and maintenance of existing intake and outfall lines.
v. Mineral extraction, including sand for restoring beaches, except in environmentally sensitive are-as.
vii. Nature study, aquaculture, or similar resource dependent activities.
b. No feasible less environmentally damaging alternative exists;
c. Feasible mitigation measures have been provided to minimize adverse environmental effects; and
d. The functional capacity of the wetland is maintained or enhanced.
D. Development within rivers and streams coastal wetland ESHA.
1. The development or use:
a. Is for one or more of the following permissible uses:
i. Necessary water supply projects.
ii. Flood control projects where no other method for protecting existing structures in the floodplain is feasible and where such protection is necessary for public safety or to protect existing development.
iii. Developments where the primary function is the improvement of fish and wildlife habitat.
b. Incorporates the best mitigation measures feasible.
E. Development adjacent to ESHA. The development or use is:
1. Sited and designed to prevent impacts which would significantly degrade those adjacent environmentally sensitive areas and buffers; and
2. Shall be compatible with the continuance of those habitat areas and buffers.
(Ord. of 2-22-2011(1))