The 2022 California Green Building Standards Code ("CALGreen") adopted herein by reference is hereby amended by the following additions, deletions, and amendments, together with such changes made by Sections
14.48.030 through
14.48.070:
Section 202 of Chapter 2 is hereby amended by revising the definitions of Electric Vehicle Charging Station and of Newly Constructed (or New Construction) to read as follows:
ELECTRIC VEHICLE CHARGING STATION (EVCS). One or more electric vehicle charging spaces served by electric vehicle charger(s) or other charging equipment allowing charging of electric vehicles. For purposes of determining compliance with accessibility requirements, when the permitted length of time a vehicle may occupy an electric vehicle charging station differs from the permitted duration of stay in publicly accessible parking spaces in the same parking area, electric vehicle charging stations are not considered parking spaces. When the permitted duration of stay in a space served by electric vehicle charger(s) is the same as other publicly accessible parking spaces in the same parking area, EVCS may be considered parking spaces. The EVCS need not be reserved exclusively for electric vehicle charging.
NEWLY CONSTRUCTED (or NEW CONSTRUCTION). A newly constructed building (or new construction) includes the production of new or replacement building(s) and major remodels.
Section 301.1 of Chapter 3 is hereby amended by replacing the first sentence with the following:
301.1 Scope. Buildings shall be designed to comply with the applicable requirements of the Mill Valley Municipal Code beginning at Chapter 14.48.010, and shall also include the green building measures specified as mandatory in the application checklists contained in this code.
Section 301.1.1 of Chapter 3 is hereby amended by replacing the first sentence with the following:
301.1.1 Additions and alterations. The mandatory provisions of Chapter 4 shall be applied to additions and alterations of existing residential buildings, in accordance with applicable requirements of Chapter
14.48 of the Mill Valley Municipal Code.
Section 301.3 of Chapter 3 is hereby amended by replacing the first sentence with the following:
301.3 Nonresidential additions and alterations. The provisions of individual sections of Chapter 5 apply to newly constructed buildings and building additions and alterations (for occupancies within the authority of California Building Standards Commission).
Section 4.106.4.2 of Chapter 4 is hereby amended to read in its entirety as follows:
Section 4.106.4.2 New multifamily dwellings, Hotel and Motels and New Residential Parking Facilities. If residential parking is available, the number of spaces designated for the project type as outlined in Table 1 of Section
14.48.040 of the Mill Valley Municipal Code, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future EVSE. Calculations for the required number of EV spaces shall be rounded up to the nearest whole number.
Section 5.106.5.3 of Chapter 5 is hereby amended by replacing the first sentence with the following:
Section 5.106.5.3 Electric vehicle (EV) Charging. Construction shall comply with Section 5.106.5.3.1, using the space requirements designated for the project type as outlined in Table 1 of Section
14.48.040 of the Mill Valley Municipal Code, to facilitate future installation of electric vehicle supply equipment (EVSE).
Section A4.106.8.2.1 of Appendix A4 is hereby amended by revising "Tier 1" to read as follows:
The number of spaces designated for the project type as outlined in Table 1 of Section
14.48.040 of the Mill Valley Municipal Code, provided for all types of parking facilities, but in no case less than one, shall be electric vehicle charging spaces (EV spaces) capable of supporting future EVSE. Calculations for the required number of EV spaces shall be rounded up to the nearest whole number.
(Ord. 1313 § 2, December 2, 2019; Ord. 1340 § 8, December 5, 2022)