For the purposes of this chapter, the following terms shall
have the following meanings:
"City's checklist"
means the checklist developed by the city of all requirements
with which electric vehicle charging stations shall comply to be eligible
for expedited review. The city's checklist shall be published on the
city's publicly accessible Internet website.
"Electric vehicle charging station" or "charging station"
means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as adopted by the city pursuant to Chapter
15.08 of this code, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
"Electronic submittal"
means the utilization of one or more of the following: email,
the Internet, or facsimile.
"Specific, adverse impact"
means a significant, quantifiable, direct, and unavoidable
impact, based on objective, identified, and written public health
or safety standards, policies, or conditions as they existed on the
date an application was deemed complete.
(Ord. 423 § 1, 2017)