[Ord. No. 2480, 5-8-2023]
A re-subdivision of an existing lot or parcel which results in the creation of no more than one (1) additional lot or parcel shall only require the submittal of a final plat in accordance with lot split requirements of these Regulations.
[Ord. No. 2480, 5-8-2023]
A re-subdivision of an existing lot or parcel which results in the creation of two (2) or more additional lots or parcels shall require the submittal of both a preliminary plat and a final plat in accordance with Articles V and VI of these Regulations.
[Ord. No. 2480, 5-8-2023]
The engineer shall review said re-subdivision to determine if the existing infrastructure (i.e., sewer lines, water lines, streets, etc.) needs to be upgraded as a result of the creation of an additional lot or lots. If upgrading is needed, the re-subdivider shall be responsible for the improvements.