(a)
Subdivision applications.
Sum of all applicable fees included within this section.
(b)
Letter of certification (LOC).
(1)
Preliminary plat or development plat: $1,250.00 plus $50.00 per lot/unit (condo) or per acre, whichever is greater.
(2)
Preliminary plat amendment: $250.00 plus $50.00 per lot/unit (condo) or per acre, whichever is greater.
(3)
Final plat: $850.00 plus $25.00 per lot/unit (condo) or per acre, whichever is greater.
(4)
Replat: $850.00 plus $25.00 per lot/unit (condo) or per acre, whichever is greater.
(5)
Amending plat: $350.00 plus $25.00 per lot/unit (condo) or per acre, whichever is greater.
(6)
Short form final plat: $500.00 plus $25.00 per lot/unit (condo) or per acre, whichever is greater.
(7)
Minor plat: $350.00 plus $25.00 per lot/unit (condo) or per acre, whichever is greater.
(8)
Development plat: $2,500.00.
(9)
Subdivision construction plans: One and a half percent (1.5%) of infrastructure cost estimate, maximum of $30,000.00, and $2,500.00 engineering deposit.
(10)
LOC review beyond the 3rd review cycle (i.e. 4th submittal): Ten percent (10%) of the base application fee per additional review.
(c)
Plat review fees.
If a letter of certification application is not required, the fees shall be as listed below plus the applicable letter of certification fees.
Plat Type | Fee |
|---|---|
Preliminary plat | $500.00 |
Preliminary plat amendment | $250.00 |
Final plat | $250.00 |
Short form final plat | $150.00 |
Minor plat | $150.00 |
Replat | $250.00 |
Amending plat | $150.00 |
Development plat | $500.00 |
(d)
Subdivision construction plan review fee: $500.00 or $500.00 plus the applicable letter of certification fee if no letter of certification is required.
(e)
Subdivision construction plan revision: Revised plan sheets 1-4: $500.00; additional revised plan sheets $250.00 each.
(f)
Subdivision construction plan amendment: Three percent (3%) of the infrastructure construction amendment cost estimate; maximum of $10,000.00.
(g)
Subdivision construction plan inspection: Two percent (2%) of the infrastructure cost estimate excluding utilities. Due at plan approval prior to scheduling required preconstruction meeting.
(h)
Petition for subdivision waiver: $150.00 per waiver plus $250.00 city council meeting fee.
(i)
Easements, restrictive covenants, and other separate instrument document review and recordation: $250.00 each plus applicable recordation fees, see section A3.010.
(j)
Easement, plat or right-of-way vacations (full or partial):
(k)
Trip generation, traffic impact analysis, and related reviews: If required, see section A3.007 for applicable fees.
(l)
Parkland dedication fee in lieu: The fee shall be based on the county appraisal district's current market value of the subject property, prorated on a per acre basis for the required parkland dedication acreage. See UDC, section 6.3.
(Ordinance 222 adopted 9/23/14; Ordinance 495 adopted 12/16/2022; Ordinance 523 adopted 11/14/2023)