home
Home
code
Code
Code
Index
law
Laws (11)
New Laws (11)
help_center
Help
Help
About Us
ecode
ecode
search
Login
City of Grand Junction, CO
chevron_right
2024-08-02 *
info
chevron_right
Volume II Development Regulations
chevron_right
Title 28 Stormwater Management Manual
The Charter
Ttl CHA
The Charter of the City of Grand Junction, Colorado
Municipal Code
Ttl 1
General Provisions
Ttl 2
Administration and Personnel
Ttl 3
Revenue and Finance
Ttl 4
(Reserved)
Ttl 5
Business Licenses and Regulations
Ttl 6
Animals
Ttl 7
(Reserved)
Ttl 8
Health and Safety
Ttl 9
Public Peace, Morals and Welfare
Ttl 10
Traffic and Vehicles
Ttl 11
(Reserved)
Ttl 12
Streets, Sidewalks and Public Property
Ttl 13
Water and Sewers
Ttl 14
(Reserved)
Ttl 15
Buildings and Construction
Apx A
Franchises
Apx B
Tables
Development Regulations
Ttl 21
Zoning and Development Code
Ttl 22
H Road/Northwest Area Plan
Ttl 23
North Avenue Overlay Zone District
Ttl 24
Greater Downtown Overlay
Ttl 25
24 Road Corridor Design Standards
Ttl 26
North Seventh Street Historic Residential District Guidelines and Standards
Ttl 27
Horizon Drive District – Overlay Zone District Standards
Ttl 28
Stormwater Management Manual
Ch 28.04
Introduction
§ 28.04.010
General index.
§ 28.04.020
Purpose and intent.
§ 28.04.030
Amendments to this manual.
§ 28.04.040
Purchase of a copy of the manual codified in this title.
§ 28.04.050
Acknowledgement.
§ 28.04.060
Updating and revisions.
Ch 28.08
General Provisions
§ 28.08.010
Title.
§ 28.08.020
Jurisdiction.
§ 28.08.030
Adoption authority.
§ 28.08.040
Enforcement responsibility.
§ 28.08.050
Review and acceptance.
§ 28.08.060
Interpretation.
§ 28.08.070
Deviation/variance procedures.
§ 28.08.080
Acronyms.
§ 28.08.090
Definitions.
Ch 28.12
Drainage Planning Submittal Requirements
§ 28.12.010
Review process.
§ 28.12.020
Submittal requirements.
§ 28.12.030
Conceptual/preliminary drainage report.
§ 28.12.040
Conceptual/preliminary report contents.
§ 28.12.050
Conceptual/preliminary report drawing contents.
§ 28.12.060
Final drainage report.
§ 28.12.070
Final report contents.
§ 28.12.080
Final report drawing contents.
§ 28.12.090
Construction plans.
§ 28.12.100
Post-construction BMPs.
§ 28.12.110
Construction SWMP.
§ 28.12.120
Record drawings and acceptances.
§ 28.12.130
Submittal checklist.
Ch 28.16
Drainage Policy
§ 28.16.010
Introduction.
§ 28.16.020
Basic principles.
§ 28.16.030
Regional and local planning.
§ 28.16.040
Regional master planning.
§ 28.16.050
Drainage improvements.
§ 28.16.060
Drainage fee calculation.
§ 28.16.070
Proposed drainage improvements.
§ 28.16.080
Floodplain management.
§ 28.16.090
Storm runoff detention.
§ 28.16.100
Storm runoff retention.
§ 28.16.110
Stormwater quality.
§ 28.16.120
Drainage facilities maintenance.
§ 28.16.130
Watershed transfer of storm runoff.
§ 28.16.140
Technical criteria – Stormwater management technology.
§ 28.16.150
Technical criteria – Design storm events.
§ 28.16.160
Technical criteria – Storm runoff determination.
§ 28.16.170
Technical criteria – Streets.
§ 28.16.180
Technical criteria – Flood proofing.
§ 28.16.190
Technical criteria – Alluvial fans.
§ 28.16.200
Irrigation facilities.
§ 28.16.210
Irrigation facilities – Watershed analysis.
§ 28.16.220
Irrigation facilities – Discharge to irrigation conveyance facility.
§ 28.16.230
Irrigation facilities – Irrigation reservoirs.
§ 28.16.240
Preservation of natural drainageways.
Ch 28.20
(Reserved)
Ch 28.24
Rainfall
§ 28.24.010
Introduction.
§ 28.24.020
Data sources.
§ 28.24.030
Comparison to NOAA Atlas 14.
§ 28.24.040
Rainfall analysis – Rainfall depth – Duration – Frequency.
§ 28.24.050
Rainfall analysis – Rainfall depths for durations from one to six hours and less than one hour.
§ 28.24.060
Rainfall analysis – Mean annual precipitation and storm events.
§ 28.24.070
Depth-area reduction factors.
§ 28.24.080
Intensity-duration-frequency curves for rational method.
§ 28.24.090
Design storms.
Ch 28.28
Storm Runoff
§ 28.28.010
Introduction.
§ 28.28.020
Watershed characteristics.
§ 28.28.030
Time of concentration.
§ 28.28.040
Nonurbanized watersheds.
§ 28.28.050
Urbanized watersheds.
§ 28.28.060
Precipitation losses.
§ 28.28.070
SCS curve number method.
§ 28.28.080
CN determination.
§ 28.28.090
Green and Ampt method.
§ 28.28.100
Rational formula method.
§ 28.28.110
SCS unit hydrograph method.
§ 28.28.120
Channel routing of hydrographs.
§ 28.28.130
Reservoir routing of hydrographs.
Ch 28.32
Open Channels
§ 28.32.010
Introduction.
§ 28.32.020
Parameters and terms commonly used in open channel analysis and design.
§ 28.32.030
General open channel flow.
§ 28.32.040
Uniform flow computation.
§ 28.32.050
Critical flow computation.
§ 28.32.060
Design procedures – Subcritical flow.
§ 28.32.070
Design procedures – Supercritical flow.
§ 28.32.080
Design procedures – Superelevation.
§ 28.32.090
Transitions.
§ 28.32.100
Types of open channels and their selection.
§ 28.32.110
Natural channel systems.
§ 28.32.120
Channel morphology.
§ 28.32.130
Channel restoration.
§ 28.32.140
General design criteria for improved open channels.
§ 28.32.150
Channel type selection.
§ 28.32.160
Hydraulic capacity.
§ 28.32.170
Manning roughness coefficient.
§ 28.32.180
Uniform flow.
§ 28.32.190
Vertical and horizontal alignment.
§ 28.32.200
Maximum permissible velocity.
§ 28.32.210
Subcritical and supercritical flow.
§ 28.32.220
Freeboard.
§ 28.32.230
Flow transitions.
§ 28.32.240
Access and safety.
§ 28.32.250
Environmental permitting.
§ 28.32.260
Maintenance.
§ 28.32.270
Design criteria for natural and alluvial-bed (erodible) channels.
§ 28.32.280
Grass-lined channels.
§ 28.32.290
Wetland-bottom channel.
§ 28.32.300
Design criteria – Riprap-lined channels.
§ 28.32.310
Design criteria – Concrete-lined channels.
§ 28.32.320
Design criteria – Other channel linings.
§ 28.32.330
Design standards for minor artificial drainageways.
§ 28.32.340
Channel appurtenances.
§ 28.32.350
Example application.
Ch 28.36
Additional Hydraulic Structures
§ 28.36.010
Introduction.
§ 28.36.020
Channel drop structures.
§ 28.36.030
Grouted sloping boulder (GSB) drop structure.
§ 28.36.040
Vertical riprap drop structure (vertical hard drop basin).
§ 28.36.050
Straight drop spillway.
§ 28.36.060
Baffled aprons (USBR Type IX, baffle chute drop).
§ 28.36.070
Energy dissipation structures.
§ 28.36.080
Increased roughness basins.
§ 28.36.090
Induced hydraulic jump basins.
§ 28.36.100
Impact basins.
§ 28.36.110
Overbank prevention structures and wasteways.
§ 28.36.120
Side-channel spillways.
§ 28.36.130
Gated turnouts.
§ 28.36.140
Pipe appurtenances.
§ 28.36.150
Pipe collars.
§ 28.36.160
Thrust blocks at pipe bends.
§ 28.36.170
Valves.
Ch 28.40
Storm Drain Systems
§ 28.40.010
Introduction.
§ 28.40.020
Storm drain design criteria.
§ 28.40.030
Storm drain design criteria – Allowable capacity.
§ 28.40.040
Storm drain design criteria – Allowable velocity.
§ 28.40.050
Storm drain design criteria – Pipe roughness.
§ 28.40.060
Storm drain design criteria – System layout.
§ 28.40.070
Storm drain hydraulics.
§ 28.40.080
Gravity-flow analysis.
§ 28.40.090
Pressure-flow analysis.
§ 28.40.100
Computer hydraulic modeling.
§ 28.40.110
Construction standards.
§ 28.40.120
Storm drain pipe.
§ 28.40.130
Manholes.
§ 28.40.140
Inlets.
§ 28.40.150
Outlets.
§ 28.40.160
Storm drain system design.
§ 28.40.170
Initial storm drain design.
§ 28.40.180
Preliminary/final storm drain design.
§ 28.40.190
Example design application.
Ch 28.44
Streets
§ 28.44.010
Introduction.
§ 28.44.020
Streets as part of the drainage system.
§ 28.44.030
Drainage impacts on traffic and streets.
§ 28.44.040
Sheet flow.
§ 28.44.050
Gutter flow.
§ 28.44.060
Temporary ponding and localized cross flow.
§ 28.44.070
Pavement deterioration effects.
§ 28.44.080
Sedimentation and debris.
§ 28.44.090
Street classification and allowable flow depth and velocities.
§ 28.44.100
Street hydraulic capacity evaluation.
§ 28.44.110
Storm inlet selection, sizing, and location.
§ 28.44.120
Hydraulic capacity of inlets on a continuous grade.
§ 28.44.130
Hydraulic capacity of inlets in sump conditions.
§ 28.44.140
Inlet clogging considerations.
§ 28.44.150
Grate selection and rating.
§ 28.44.160
Inlet location and spacing.
Ch 28.48
Culverts and Bridges
§ 28.48.010
Introduction.
§ 28.48.020
Culvert hydraulics.
§ 28.48.030
Required design information.
§ 28.48.040
Inlet control.
§ 28.48.050
Outlet control.
§ 28.48.060
Culvert sizing and design.
§ 28.48.070
Size and material.
§ 28.48.080
Location.
§ 28.48.090
Culvert Design Form.
§ 28.48.100
Inlet control calculation.
§ 28.48.110
Outlet control calculation.
§ 28.48.120
Evaluation of results.
§ 28.48.130
Outlet velocity calculation.
§ 28.48.140
Computer applications.
§ 28.48.150
Outlet protection.
§ 28.48.160
Trash/safety racks.
§ 28.48.170
Culvert inlets.
§ 28.48.180
Projecting inlets.
§ 28.48.190
Inlets with headwalls.
§ 28.48.200
Tapered inlets.
§ 28.48.210
Bridge hydraulics.
§ 28.48.220
Hydraulic analysis.
§ 28.48.230
Expression of backwater.
§ 28.48.240
Backwater coefficient.
§ 28.48.250
Effect of M and abutment shape (base curves).
§ 28.48.260
Effect of piers (normal crossings).
§ 28.48.270
Bridge sizing and design.
§ 28.48.280
Example application – Culvert sizing.
Ch 28.52
Irrigation/Drainage Structures
§ 28.52.010
Introduction.
§ 28.52.020
Irrigation ditch crossings (cross-drainage structures).
§ 28.52.030
Inverted siphons.
§ 28.52.040
Overchutes (flumes and pipe overchutes).
Ch 28.56
Detention and Retention
§ 28.56.010
Introduction.
§ 28.56.020
Detention versus retention.
§ 28.56.030
Local detention facilities.
§ 28.56.040
Regional detention facilities.
§ 28.56.050
Drainage fee in lieu of detention.
§ 28.56.060
Drainage fee basis.
§ 28.56.070
Drainage fee calculation.
§ 28.56.080
Detention for management of stormwater quality.
§ 28.56.090
Design storm criteria.
§ 28.56.100
Geometric requirements.
§ 28.56.110
Dry basin bottom drainage.
§ 28.56.120
Accessibility and maintenance.
§ 28.56.130
Calculating storage volume available.
§ 28.56.140
Groundcover and landscaping.
§ 28.56.150
Freeboard requirements.
§ 28.56.160
State Engineer’s Office.
§ 28.56.170
Embankment protection.
§ 28.56.180
Inlet and outlet design.
§ 28.56.190
Off-site flows.
§ 28.56.200
Retention.
§ 28.56.210
Hydrologic design methods and criteria.
§ 28.56.220
HEC-1 method.
§ 28.56.230
Rational method.
§ 28.56.240
Compensating detention analysis.
§ 28.56.250
Over-detention analysis.
§ 28.56.260
Hydraulic design of outlet works.
Ch 28.60
Construction Site Stormwater Runoff Control
§ 28.60.010
Introduction.
§ 28.60.020
Colorado discharge permit.
§ 28.60.030
Standards and requirements – Stormwater discharge limitations.
§ 28.60.040
Standards and requirements – Minimum BMP requirements.
§ 28.60.050
Standards and requirements – Acceptable BMPs.
§ 28.60.060
Stormwater permit.
§ 28.60.070
Stormwater permit variance/exception.
§ 28.60.080
Inspection and enforcement – Mesa County.
§ 28.60.090
Inspection and enforcement – City of Grand Junction.
§ 28.60.100
Inspection and enforcement – Other municipalities.
§ 28.60.110
Construction SWMP.
§ 28.60.120
Site description.
§ 28.60.130
Site map.
§ 28.60.140
Stormwater management controls.
§ 28.60.150
Final stabilization and long-term stormwater management.
§ 28.60.160
Inspection and maintenance.
§ 28.60.170
Certification.
§ 28.60.180
Estimated BMP costs.
§ 28.60.190
Permit transfer requirements.
§ 28.60.200
Checklist.
Ch 28.64
Post-Construction Stormwater Management
§ 28.64.010
Introduction.
§ 28.64.020
Standards for best management practices (BMPs) – Minimum structural BMPs requirements.
§ 28.64.030
Standards for best management practices (BMPs) – Aesthetic requirements.
§ 28.64.040
Standards for best management practices (BMPs) – Proprietary BMPs.
§ 28.64.050
Standards for best management practices (BMPs) – Considerations in BMPs selection.
§ 28.64.060
Standards for best management practices (BMPs) – Local modifications to minimum structural BMPs.
§ 28.64.070
Final drainage report.
§ 28.64.080
Water quality capture volume.
§ 28.64.090
Directly connected impervious area.
§ 28.64.100
Water quality capture volume.
§ 28.64.110
Nonstructural BMPs – General information.
§ 28.64.120
Nonstructural BMPs – Spill prevention and response.
§ 28.64.130
Inspection and enforcement.
§ 28.64.140
BMPs for industrial and commercial activities.
§ 28.64.150
Industrial and commercial activities.
§ 28.64.160
Best management practices.
Ch 28.68
Standard Forms
§ 28.68.010
Hydrologic and hydraulic design forms.
§ 28.68.020
Stormwater permit applications and report forms.
Ch 28.72
References
§ 28.72.010
References.
Ch 28.76
Drainage Law
§ 28.76.010
Introduction.
§ 28.76.020
Historical evolution of surface water drainage law.
§ 28.76.030
Legal principles.
§ 28.76.040
Local governments – Drainage responsibilities and powers.
§ 28.76.050
Applicable drainage laws.
§ 28.76.060
Special matters – Irrigation ditches.
§ 28.76.070
Special matters – Ditch owner’s duty to maintain, use and manage their ditches.
§ 28.76.080
Special matters – Water quality.
§ 28.76.090
Special matters – Economic loss rule – Duty of care.
§ 28.76.100
Special matters – Water rights and drainage improvements.
§ 28.76.110
Special matters – Governmental entity not liable for refusal to issue certificate of occupancy of residence constructed in a floodplain.
§ 28.76.120
Special matters – Any legislatively formulated assessment, fee or charge that is imposed on a broad class of property owners by a local government is not considered taking of property.
§ 28.76.130
Special matters – Governmental immunity in regard to irrigation and drainage ditches used as part of stormwater drainage system.
§ 28.76.140
Special matters – Concerning interference with the flow of water in ditch.
Ch 28.80
Excerpts From UDSCD Volume 3
§ 28.80.010
Excerpts from UDSCD Volume 3.
Ch 28.84
Cross-Reference Table
§ 28.84.010
Cross-reference table.
Ttl 29
Transportation Engineering Design Standards (Teds)
Comprehensive Plan
Ttl 31
Comprehensive Plan
Ttl 32
North Avenue Corridor
Ttl 33
24 Road Corridor Subarea Plan
Ttl 34
Redlands Area Plan
Ttl 35
(Reserved)
Ttl 36
Greater Downtown Plan
Ttl 37
Pear Park Neighborhood Plan
Ttl 38
(Reserved)
Ttl 39
Orchard Mesa Neighborhood Plan
Policies
Ttl 41
Purchasing Policy and Procedure Manual
Ttl 42
Emergency Management
Ttl 43
Accessory Dwelling Unit Production Program
Ttl 44
Planning Agreements
Ttl 45
Waters, Sewers and Sanitation Districts
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Title 28
Stormwater Management Manual
[Prior legislation – Res. 68-94.]
Chapter 28.04
Introduction
chevron_right
§ 28.04.010
General index.
chevron_right
§ 28.04.020
Purpose and intent.
chevron_right
§ 28.04.030
Amendments to this manual.
chevron_right
§ 28.04.040
Purchase of a copy of the manual codified in this title.
chevron_right
§ 28.04.050
Acknowledgement.
chevron_right
§ 28.04.060
Updating and revisions.
chevron_right
Chapter 28.08
General Provisions
chevron_right
§ 28.08.010
Title.
chevron_right
§ 28.08.020
Jurisdiction.
chevron_right
§ 28.08.030
Adoption authority.
chevron_right
§ 28.08.040
Enforcement responsibility.
chevron_right
§ 28.08.050
Review and acceptance.
chevron_right
§ 28.08.060
Interpretation.
chevron_right
§ 28.08.070
Deviation/variance procedures.
chevron_right
§ 28.08.080
Acronyms.
chevron_right
§ 28.08.090
Definitions.
chevron_right
Chapter 28.12
Drainage Planning Submittal Requirements
chevron_right
§ 28.12.010
Review process.
chevron_right
§ 28.12.020
Submittal requirements.
chevron_right
§ 28.12.030
Conceptual/preliminary drainage report.
chevron_right
§ 28.12.040
Conceptual/preliminary report contents.
chevron_right
§ 28.12.050
Conceptual/preliminary report drawing contents.
chevron_right
§ 28.12.060
Final drainage report.
chevron_right
§ 28.12.070
Final report contents.
chevron_right
§ 28.12.080
Final report drawing contents.
chevron_right
§ 28.12.090
Construction plans.
chevron_right
§ 28.12.100
Post-construction BMPs.
chevron_right
§ 28.12.110
Construction SWMP.
chevron_right
§ 28.12.120
Record drawings and acceptances.
chevron_right
§ 28.12.130
Submittal checklist.
chevron_right
Chapter 28.16
Drainage Policy
chevron_right
§ 28.16.010
Introduction.
chevron_right
§ 28.16.020
Basic principles.
chevron_right
§ 28.16.030
Regional and local planning.
chevron_right
§ 28.16.040
Regional master planning.
chevron_right
§ 28.16.050
Drainage improvements.
chevron_right
§ 28.16.060
Drainage fee calculation.
chevron_right
§ 28.16.070
Proposed drainage improvements.
chevron_right
§ 28.16.080
Floodplain management.
chevron_right
§ 28.16.090
Storm runoff detention.
chevron_right
§ 28.16.100
Storm runoff retention.
chevron_right
§ 28.16.110
Stormwater quality.
chevron_right
§ 28.16.120
Drainage facilities maintenance.
chevron_right
§ 28.16.130
Watershed transfer of storm runoff.
chevron_right
§ 28.16.140
Technical criteria – Stormwater management technology.
chevron_right
§ 28.16.150
Technical criteria – Design storm events.
chevron_right
§ 28.16.160
Technical criteria – Storm runoff determination.
chevron_right
§ 28.16.170
Technical criteria – Streets.
chevron_right
§ 28.16.180
Technical criteria – Flood proofing.
chevron_right
§ 28.16.190
Technical criteria – Alluvial fans.
chevron_right
§ 28.16.200
Irrigation facilities.
chevron_right
§ 28.16.210
Irrigation facilities – Watershed analysis.
chevron_right
§ 28.16.220
Irrigation facilities – Discharge to irrigation conveyance facility.
chevron_right
§ 28.16.230
Irrigation facilities – Irrigation reservoirs.
chevron_right
§ 28.16.240
Preservation of natural drainageways.
chevron_right
Chapter 28.20
(Reserved)
chevron_right
Chapter 28.24
Rainfall
chevron_right
§ 28.24.010
Introduction.
chevron_right
§ 28.24.020
Data sources.
chevron_right
§ 28.24.030
Comparison to NOAA Atlas 14.
chevron_right
§ 28.24.040
Rainfall analysis – Rainfall depth – Duration – Frequency.
chevron_right
§ 28.24.050
Rainfall analysis – Rainfall depths for durations from one to six hours and less than one hour.
chevron_right
§ 28.24.060
Rainfall analysis – Mean annual precipitation and storm events.
chevron_right
§ 28.24.070
Depth-area reduction factors.
chevron_right
§ 28.24.080
Intensity-duration-frequency curves for rational method.
chevron_right
§ 28.24.090
Design storms.
chevron_right
Chapter 28.28
Storm Runoff
chevron_right
§ 28.28.010
Introduction.
chevron_right
§ 28.28.020
Watershed characteristics.
chevron_right
§ 28.28.030
Time of concentration.
chevron_right
§ 28.28.040
Nonurbanized watersheds.
chevron_right
§ 28.28.050
Urbanized watersheds.
chevron_right
§ 28.28.060
Precipitation losses.
chevron_right
§ 28.28.070
SCS curve number method.
chevron_right
§ 28.28.080
CN determination.
chevron_right
§ 28.28.090
Green and Ampt method.
chevron_right
§ 28.28.100
Rational formula method.
chevron_right
§ 28.28.110
SCS unit hydrograph method.
chevron_right
§ 28.28.120
Channel routing of hydrographs.
chevron_right
§ 28.28.130
Reservoir routing of hydrographs.
chevron_right
Chapter 28.32
Open Channels
chevron_right
§ 28.32.010
Introduction.
chevron_right
§ 28.32.020
Parameters and terms commonly used in open channel analysis and design.
chevron_right
§ 28.32.030
General open channel flow.
chevron_right
§ 28.32.040
Uniform flow computation.
chevron_right
§ 28.32.050
Critical flow computation.
chevron_right
§ 28.32.060
Design procedures – Subcritical flow.
chevron_right
§ 28.32.070
Design procedures – Supercritical flow.
chevron_right
§ 28.32.080
Design procedures – Superelevation.
chevron_right
§ 28.32.090
Transitions.
chevron_right
§ 28.32.100
Types of open channels and their selection.
chevron_right
§ 28.32.110
Natural channel systems.
chevron_right
§ 28.32.120
Channel morphology.
chevron_right
§ 28.32.130
Channel restoration.
chevron_right
§ 28.32.140
General design criteria for improved open channels.
chevron_right
§ 28.32.150
Channel type selection.
chevron_right
§ 28.32.160
Hydraulic capacity.
chevron_right
§ 28.32.170
Manning roughness coefficient.
chevron_right
§ 28.32.180
Uniform flow.
chevron_right
§ 28.32.190
Vertical and horizontal alignment.
chevron_right
§ 28.32.200
Maximum permissible velocity.
chevron_right
§ 28.32.210
Subcritical and supercritical flow.
chevron_right
§ 28.32.220
Freeboard.
chevron_right
§ 28.32.230
Flow transitions.
chevron_right
§ 28.32.240
Access and safety.
chevron_right
§ 28.32.250
Environmental permitting.
chevron_right
§ 28.32.260
Maintenance.
chevron_right
§ 28.32.270
Design criteria for natural and alluvial-bed (erodible) channels.
chevron_right
§ 28.32.280
Grass-lined channels.
chevron_right
§ 28.32.290
Wetland-bottom channel.
chevron_right
§ 28.32.300
Design criteria – Riprap-lined channels.
chevron_right
§ 28.32.310
Design criteria – Concrete-lined channels.
chevron_right
§ 28.32.320
Design criteria – Other channel linings.
chevron_right
§ 28.32.330
Design standards for minor artificial drainageways.
chevron_right
§ 28.32.340
Channel appurtenances.
chevron_right
§ 28.32.350
Example application.
chevron_right
Chapter 28.36
Additional Hydraulic Structures
chevron_right
§ 28.36.010
Introduction.
chevron_right
§ 28.36.020
Channel drop structures.
chevron_right
§ 28.36.030
Grouted sloping boulder (GSB) drop structure.
chevron_right
§ 28.36.040
Vertical riprap drop structure (vertical hard drop basin).
chevron_right
§ 28.36.050
Straight drop spillway.
chevron_right
§ 28.36.060
Baffled aprons (USBR Type IX, baffle chute drop).
chevron_right
§ 28.36.070
Energy dissipation structures.
chevron_right
§ 28.36.080
Increased roughness basins.
chevron_right
§ 28.36.090
Induced hydraulic jump basins.
chevron_right
§ 28.36.100
Impact basins.
chevron_right
§ 28.36.110
Overbank prevention structures and wasteways.
chevron_right
§ 28.36.120
Side-channel spillways.
chevron_right
§ 28.36.130
Gated turnouts.
chevron_right
§ 28.36.140
Pipe appurtenances.
chevron_right
§ 28.36.150
Pipe collars.
chevron_right
§ 28.36.160
Thrust blocks at pipe bends.
chevron_right
§ 28.36.170
Valves.
chevron_right
Chapter 28.40
Storm Drain Systems
chevron_right
§ 28.40.010
Introduction.
chevron_right
§ 28.40.020
Storm drain design criteria.
chevron_right
§ 28.40.030
Storm drain design criteria – Allowable capacity.
chevron_right
§ 28.40.040
Storm drain design criteria – Allowable velocity.
chevron_right
§ 28.40.050
Storm drain design criteria – Pipe roughness.
chevron_right
§ 28.40.060
Storm drain design criteria – System layout.
chevron_right
§ 28.40.070
Storm drain hydraulics.
chevron_right
§ 28.40.080
Gravity-flow analysis.
chevron_right
§ 28.40.090
Pressure-flow analysis.
chevron_right
§ 28.40.100
Computer hydraulic modeling.
chevron_right
§ 28.40.110
Construction standards.
chevron_right
§ 28.40.120
Storm drain pipe.
chevron_right
§ 28.40.130
Manholes.
chevron_right
§ 28.40.140
Inlets.
chevron_right
§ 28.40.150
Outlets.
chevron_right
§ 28.40.160
Storm drain system design.
chevron_right
§ 28.40.170
Initial storm drain design.
chevron_right
§ 28.40.180
Preliminary/final storm drain design.
chevron_right
§ 28.40.190
Example design application.
chevron_right
Chapter 28.44
Streets
chevron_right
§ 28.44.010
Introduction.
chevron_right
§ 28.44.020
Streets as part of the drainage system.
chevron_right
§ 28.44.030
Drainage impacts on traffic and streets.
chevron_right
§ 28.44.040
Sheet flow.
chevron_right
§ 28.44.050
Gutter flow.
chevron_right
§ 28.44.060
Temporary ponding and localized cross flow.
chevron_right
§ 28.44.070
Pavement deterioration effects.
chevron_right
§ 28.44.080
Sedimentation and debris.
chevron_right
§ 28.44.090
Street classification and allowable flow depth and velocities.
chevron_right
§ 28.44.100
Street hydraulic capacity evaluation.
chevron_right
§ 28.44.110
Storm inlet selection, sizing, and location.
chevron_right
§ 28.44.120
Hydraulic capacity of inlets on a continuous grade.
chevron_right
§ 28.44.130
Hydraulic capacity of inlets in sump conditions.
chevron_right
§ 28.44.140
Inlet clogging considerations.
chevron_right
§ 28.44.150
Grate selection and rating.
chevron_right
§ 28.44.160
Inlet location and spacing.
chevron_right
Chapter 28.48
Culverts and Bridges
chevron_right
§ 28.48.010
Introduction.
chevron_right
§ 28.48.020
Culvert hydraulics.
chevron_right
§ 28.48.030
Required design information.
chevron_right
§ 28.48.040
Inlet control.
chevron_right
§ 28.48.050
Outlet control.
chevron_right
§ 28.48.060
Culvert sizing and design.
chevron_right
§ 28.48.070
Size and material.
chevron_right
§ 28.48.080
Location.
chevron_right
§ 28.48.090
Culvert Design Form.
chevron_right
§ 28.48.100
Inlet control calculation.
chevron_right
§ 28.48.110
Outlet control calculation.
chevron_right
§ 28.48.120
Evaluation of results.
chevron_right
§ 28.48.130
Outlet velocity calculation.
chevron_right
§ 28.48.140
Computer applications.
chevron_right
§ 28.48.150
Outlet protection.
chevron_right
§ 28.48.160
Trash/safety racks.
chevron_right
§ 28.48.170
Culvert inlets.
chevron_right
§ 28.48.180
Projecting inlets.
chevron_right
§ 28.48.190
Inlets with headwalls.
chevron_right
§ 28.48.200
Tapered inlets.
chevron_right
§ 28.48.210
Bridge hydraulics.
chevron_right
§ 28.48.220
Hydraulic analysis.
chevron_right
§ 28.48.230
Expression of backwater.
chevron_right
§ 28.48.240
Backwater coefficient.
chevron_right
§ 28.48.250
Effect of M and abutment shape (base curves).
chevron_right
§ 28.48.260
Effect of piers (normal crossings).
chevron_right
§ 28.48.270
Bridge sizing and design.
chevron_right
§ 28.48.280
Example application – Culvert sizing.
chevron_right
Chapter 28.52
Irrigation/Drainage Structures
chevron_right
§ 28.52.010
Introduction.
chevron_right
§ 28.52.020
Irrigation ditch crossings (cross-drainage structures).
chevron_right
§ 28.52.030
Inverted siphons.
chevron_right
§ 28.52.040
Overchutes (flumes and pipe overchutes).
chevron_right
Chapter 28.56
Detention and Retention
chevron_right
§ 28.56.010
Introduction.
chevron_right
§ 28.56.020
Detention versus retention.
chevron_right
§ 28.56.030
Local detention facilities.
chevron_right
§ 28.56.040
Regional detention facilities.
chevron_right
§ 28.56.050
Drainage fee in lieu of detention.
chevron_right
§ 28.56.060
Drainage fee basis.
chevron_right
§ 28.56.070
Drainage fee calculation.
chevron_right
§ 28.56.080
Detention for management of stormwater quality.
chevron_right
§ 28.56.090
Design storm criteria.
chevron_right
§ 28.56.100
Geometric requirements.
chevron_right
§ 28.56.110
Dry basin bottom drainage.
chevron_right
§ 28.56.120
Accessibility and maintenance.
chevron_right
§ 28.56.130
Calculating storage volume available.
chevron_right
§ 28.56.140
Groundcover and landscaping.
chevron_right
§ 28.56.150
Freeboard requirements.
chevron_right
§ 28.56.160
State Engineer’s Office.
chevron_right
§ 28.56.170
Embankment protection.
chevron_right
§ 28.56.180
Inlet and outlet design.
chevron_right
§ 28.56.190
Off-site flows.
chevron_right
§ 28.56.200
Retention.
chevron_right
§ 28.56.210
Hydrologic design methods and criteria.
chevron_right
§ 28.56.220
HEC-1 method.
chevron_right
§ 28.56.230
Rational method.
chevron_right
§ 28.56.240
Compensating detention analysis.
chevron_right
§ 28.56.250
Over-detention analysis.
chevron_right
§ 28.56.260
Hydraulic design of outlet works.
chevron_right
Chapter 28.60
Construction Site Stormwater Runoff Control
chevron_right
§ 28.60.010
Introduction.
chevron_right
§ 28.60.020
Colorado discharge permit.
chevron_right
§ 28.60.030
Standards and requirements – Stormwater discharge limitations.
chevron_right
§ 28.60.040
Standards and requirements – Minimum BMP requirements.
chevron_right
§ 28.60.050
Standards and requirements – Acceptable BMPs.
chevron_right
§ 28.60.060
Stormwater permit.
chevron_right
§ 28.60.070
Stormwater permit variance/exception.
chevron_right
§ 28.60.080
Inspection and enforcement – Mesa County.
chevron_right
§ 28.60.090
Inspection and enforcement – City of Grand Junction.
chevron_right
§ 28.60.100
Inspection and enforcement – Other municipalities.
chevron_right
§ 28.60.110
Construction SWMP.
chevron_right
§ 28.60.120
Site description.
chevron_right
§ 28.60.130
Site map.
chevron_right
§ 28.60.140
Stormwater management controls.
chevron_right
§ 28.60.150
Final stabilization and long-term stormwater management.
chevron_right
§ 28.60.160
Inspection and maintenance.
chevron_right
§ 28.60.170
Certification.
chevron_right
§ 28.60.180
Estimated BMP costs.
chevron_right
§ 28.60.190
Permit transfer requirements.
chevron_right
§ 28.60.200
Checklist.
chevron_right
Chapter 28.64
Post-Construction Stormwater Management
chevron_right
§ 28.64.010
Introduction.
chevron_right
§ 28.64.020
Standards for best management practices (BMPs) – Minimum structural BMPs requirements.
chevron_right
§ 28.64.030
Standards for best management practices (BMPs) – Aesthetic requirements.
chevron_right
§ 28.64.040
Standards for best management practices (BMPs) – Proprietary BMPs.
chevron_right
§ 28.64.050
Standards for best management practices (BMPs) – Considerations in BMPs selection.
chevron_right
§ 28.64.060
Standards for best management practices (BMPs) – Local modifications to minimum structural BMPs.
chevron_right
§ 28.64.070
Final drainage report.
chevron_right
§ 28.64.080
Water quality capture volume.
chevron_right
§ 28.64.090
Directly connected impervious area.
chevron_right
§ 28.64.100
Water quality capture volume.
chevron_right
§ 28.64.110
Nonstructural BMPs – General information.
chevron_right
§ 28.64.120
Nonstructural BMPs – Spill prevention and response.
chevron_right
§ 28.64.130
Inspection and enforcement.
chevron_right
§ 28.64.140
BMPs for industrial and commercial activities.
chevron_right
§ 28.64.150
Industrial and commercial activities.
chevron_right
§ 28.64.160
Best management practices.
chevron_right
Chapter 28.68
Standard Forms
chevron_right
§ 28.68.010
Hydrologic and hydraulic design forms.
chevron_right
§ 28.68.020
Stormwater permit applications and report forms.
chevron_right
Chapter 28.72
References
chevron_right
§ 28.72.010
References.
chevron_right
Chapter 28.76
Drainage Law
chevron_right
§ 28.76.010
Introduction.
chevron_right
§ 28.76.020
Historical evolution of surface water drainage law.
chevron_right
§ 28.76.030
Legal principles.
chevron_right
§ 28.76.040
Local governments – Drainage responsibilities and powers.
chevron_right
§ 28.76.050
Applicable drainage laws.
chevron_right
§ 28.76.060
Special matters – Irrigation ditches.
chevron_right
§ 28.76.070
Special matters – Ditch owner’s duty to maintain, use and manage their ditches.
chevron_right
§ 28.76.080
Special matters – Water quality.
chevron_right
§ 28.76.090
Special matters – Economic loss rule – Duty of care.
chevron_right
§ 28.76.100
Special matters – Water rights and drainage improvements.
chevron_right
§ 28.76.110
Special matters – Governmental entity not liable for refusal to issue certificate of occupancy of residence constructed in a floodplain.
chevron_right
§ 28.76.120
Special matters – Any legislatively formulated assessment, fee or charge that is imposed on a broad class of property owners by a local government is not considered taking of property.
chevron_right
§ 28.76.130
Special matters – Governmental immunity in regard to irrigation and drainage ditches used as part of stormwater drainage system.
chevron_right
§ 28.76.140
Special matters – Concerning interference with the flow of water in ditch.
chevron_right
Chapter 28.80
Excerpts From UDSCD Volume 3
chevron_right
§ 28.80.010
Excerpts from UDSCD Volume 3.
chevron_right
Chapter 28.84
Cross-Reference Table
chevron_right
§ 28.84.010
Cross-reference table.
chevron_right