A. 
The Township Engineer or their designee shall observe all phases of the installation of the permanent stormwater control facilities and the completed installation. For each phase of development, the developer shall provide notification to the Township Engineer and Township a minimum of three days prior to the installation of the permanent stormwater control facilities so that general observation of the work by the Township can be scheduled. The developer shall furnish to the Township record drawings of the subject facilities which are certified by a registered land surveyor. Full acceptance and approval of the stormwater management facilities will not occur until the installation is observed to be acceptable and record plans are approved.
B. 
If at any stage of the work the Township Engineer determines that the permanent stormwater control facilities are not being installed in accordance with the approved development plan, the Township shall revoke any existing permits until a revised development plan is submitted and approved as required by § 220-39.
C. 
DEP or its designees (e.g., County Conservation District) normally ensure compliance with any permits issued, including those for stormwater management. In addition to DEP compliance programs, the Township or its designee may inspect all phases of the construction, operations, maintenance, and any other implementation of stormwater BMPs.
D. 
During any stage of the regulated earth disturbance activities, if the Township or its designee determines that any BMPs are not being implemented in accordance with permit conditions or this chapter, the Township may suspend or revoke any existing permits issued by the Township or other approvals issued by the Township until the deficiencies are corrected.