It shall be the duty of the city to inspect all rainwater harvesting systems which require a permit to determine that they are in compliance with this article. For such inspection and the issuance of the permit, a fee shall be paid to the city prior to the issuance of such permit. Permitting of a system under 200 gallons is at no cost to the applicant.
(Ordinance 098 Rev. 1, sec. II(3), adopted 2/21/2023)