[Ord. No. 1238, 9/7/2022]
The Borough may include all costs incurred by it in reviewing
the application and the SWM site plan, as well as inspecting and monitoring
the project in the review fee charged to an applicant. As such, the
review fee may include, but not be limited to, costs for the following:
1. Administrative/clerical processing.
2. Review of the SWM site plan.